Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Carrollton Utilities's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Carrollton Utilities
Work includes to replace 2,000' of 3" water main. The project scope involves the furnishing and installation of 2,080' of 3" HDPE water main installed via open cut, three 3" gate valves, and reconnecting five water meter service lines to the new water main.
Posted Date
Jan 23, 2026
Due Date
Feb 6, 2026
Release: Jan 23, 2026
Carrollton Utilities
Close: Feb 6, 2026
Work includes to replace 2,000' of 3" water main. The project scope involves the furnishing and installation of 2,080' of 3" HDPE water main installed via open cut, three 3" gate valves, and reconnecting five water meter service lines to the new water main.
AvailableCarrollton Utilities
Work includes demolition and removal of existing screen system and associated controls and electrical components. Installation of owner supplied influent mechanically cleaned bar screen and debris compactor and associated controls. Furnish and install new ventilation systems. Associated metal fabrication work, concrete channel repair. Associated control and electrical work.
Posted Date
Nov 14, 2025
Due Date
Dec 4, 2025
Release: Nov 14, 2025
Carrollton Utilities
Close: Dec 4, 2025
Work includes demolition and removal of existing screen system and associated controls and electrical components. Installation of owner supplied influent mechanically cleaned bar screen and debris compactor and associated controls. Furnish and install new ventilation systems. Associated metal fabrication work, concrete channel repair. Associated control and electrical work.
Carrollton Utilities
Replace 4 water main valves. The project scope involves the furnishing and installation of two 4” gate valves, one 6" gate valve, and one 10" insertable plug valve.
Posted Date
Sep 28, 2025
Due Date
Oct 10, 2025
Release: Sep 28, 2025
Carrollton Utilities
Close: Oct 10, 2025
Replace 4 water main valves. The project scope involves the furnishing and installation of two 4” gate valves, one 6" gate valve, and one 10" insertable plug valve.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.