Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Carrollton Utilities
Work include switching out the old software for new software, which must run on windows 11, and requires new programming for every remote site. The scope of work includes 5 water storage tanks, 5 pump stations, 1 well that is separate from the water plant, and all of the water plant controls.
Posted Date
Jul 24, 2026
Due Date
Jul 31, 2026
Release: Jul 24, 2026
Carrollton Utilities
Close: Jul 31, 2026
Work include switching out the old software for new software, which must run on windows 11, and requires new programming for every remote site. The scope of work includes 5 water storage tanks, 5 pump stations, 1 well that is separate from the water plant, and all of the water plant controls.
AvailableCarrollton Utilities
Provide cleaning a drinking water well using the twin disc surge method.
Posted Date
Jul 24, 2026
Due Date
Jul 31, 2026
Release: Jul 24, 2026
Carrollton Utilities
Close: Jul 31, 2026
Provide cleaning a drinking water well using the twin disc surge method.
AvailableCarrollton Utilities
Project includes all Work required to rehabilitate and expand the existing wastewater treatment plant (WWTP) to an average daily treatment capacity of 2.5 million gallons per day (MGD). This Work involves comprehensive mechanical and electrical rehabilitation of critical treatment process components, as well as construction of new infrastructure to support increased capacity and improved operational performance. This Project includes the full mechanical and electrical rehabilitation of the existing clarifiers, Biotower trickling filters, ultraviolet (UV) disinfection system, lagoon liner, and electrical room. This Project also involves the modification of piping and valving systems associated with the Biotower process to improve flow control, operational flexibility, and system reliability. In addition to the rehabilitation efforts, the Project includes the construction of a new Biotower Pump Station and a new UV disinfection channel. See outside link.
Posted Date
-
Due Date
Aug 6, 2026
Carrollton Utilities
Close: Aug 6, 2026
Project includes all Work required to rehabilitate and expand the existing wastewater treatment plant (WWTP) to an average daily treatment capacity of 2.5 million gallons per day (MGD). This Work involves comprehensive mechanical and electrical rehabilitation of critical treatment process components, as well as construction of new infrastructure to support increased capacity and improved operational performance. This Project includes the full mechanical and electrical rehabilitation of the existing clarifiers, Biotower trickling filters, ultraviolet (UV) disinfection system, lagoon liner, and electrical room. This Project also involves the modification of piping and valving systems associated with the Biotower process to improve flow control, operational flexibility, and system reliability. In addition to the rehabilitation efforts, the Project includes the construction of a new Biotower Pump Station and a new UV disinfection channel. See outside link.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge