Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Bryan County Rural Water Sewer And Solid Waste Management Dist 2
Contract No. 1- Ft. Water System Improvements (New Materials) that include supplying and delivery of and not limited to eight (8)" HDPE DR 11 24,300 ft; steel conduit; HDPE conduit; valves; hydrants; and miscellaneous related items associated with potable water and in compliance with AWWA C901/C906 and NSF-61 standards for water; Contract No. 2-Ft. Water System Improvements (Construction and Installation) of approx. 24,000 LF of eight (8) inch new HDPE water line; 1,100 LF directional boring; valves; hydrants; 18,000 LF of 1.25 in conduit; and other appurtenances to complete a new installation of waterline and conduit.
Posted Date
Apr 3, 2026
Due Date
Apr 23, 2026
Release: Apr 3, 2026
Bryan County Rural Water Sewer And Solid Waste Management Dist 2
Close: Apr 23, 2026
Contract No. 1- Ft. Water System Improvements (New Materials) that include supplying and delivery of and not limited to eight (8)" HDPE DR 11 24,300 ft; steel conduit; HDPE conduit; valves; hydrants; and miscellaneous related items associated with potable water and in compliance with AWWA C901/C906 and NSF-61 standards for water; Contract No. 2-Ft. Water System Improvements (Construction and Installation) of approx. 24,000 LF of eight (8) inch new HDPE water line; 1,100 LF directional boring; valves; hydrants; 18,000 LF of 1.25 in conduit; and other appurtenances to complete a new installation of waterline and conduit.
AvailableBryan County Rural Water Sewer And Solid Waste Management Dist 2
Construction of a 0.75-million gallon elevated storage tank and connection pipeline to and from a new water main.
Posted Date
Sep 12, 2025
Due Date
Oct 13, 2025
Release: Sep 12, 2025
Bryan County Rural Water Sewer And Solid Waste Management Dist 2
Close: Oct 13, 2025
Construction of a 0.75-million gallon elevated storage tank and connection pipeline to and from a new water main.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Bryan County Rural Water Sewer And Solid Waste Management Dist 2
The board discussed replacing a section of gray pipe with a larger ultra blue pipe to serve proposed lots. They considered the recommendations on the Blue River Pump Station Backwash Line and discussed funding options, including contacting the Choctaws. There was also a discussion about offering customers a Leak Insurance or Forgiveness Program, pending approval from Rural Development. The board approved checks written in October and reviewed the financial report.
The board meeting included updates on Water Well #2 and the Water Treatment Plant Expansion Project. There was consideration of upgrading the waterline, purchasing an actuator for the Water Treatment Plant, and the possibility of charging a surcharge for credit/debit card and E-Check payments, which was postponed. The board also considered increasing water rates, the proposed budget for 2023/24, and charging an evaluation fee to prospective developers. An executive session was convened to discuss evaluations and wages for the Manager, Field Superintendent, and Lead Plant Operator, followed by a decision to give them all a 5% pay raise. The board also approved an invoice for a test hole and checks written in August.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Bryan County Rural Water Sewer And Solid Waste Management Dist 2's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database