Bowlegs-Lima Water District - 2" Waterline Relocation Along London Coker Rd. RFP
Posted
Oct 22, 2026
Nov 30, 2026
Construct 1,520 LF of 3" DR-11 HDPE IPS, 1,825 LF of 2" class 200 PVC, 95 LF of 1.5" class 200 PVC, 550 LF of 3" directional boring, 114 LF of 6" bore & steel casing (sealed & vented), 75 LF of 4" steel casing (trenched), all fittings, valves, hydrants, service connections and appurtenances as shown in the plans.



