Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Borough of Sayreville
HVAC and Boiler Equipment Maintenance, Repair and Replacement.
Posted Date
Mar 2, 2026
Due Date
Mar 11, 2026
Release: Mar 2, 2026
Borough of Sayreville
Close: Mar 11, 2026
HVAC and Boiler Equipment Maintenance, Repair and Replacement.
Borough of Sayreville
upgrading the existing asphalt / concrete walkways located within the Kennedy Park property of the Borough. The work includes soil erosion / sediment control measures; removal of existing granite block / concrete curb and replacement with approx. 100 LF +/- of standard concrete curb; removal of approx. 11,000 SF +/- of existing concrete sidewalks, slabs and/or driveway aprons; construction of approx. 250 SF +/- of 6" thick reinforced concrete sidewalk / apron, and construction of approx. 2,500 SF +/- of 4" thick reinforced concrete sidewalk with cast-in-place handicapped sidewalk ramp delineations; construction of approx. 2,200 SY +/- of new 8' wide HMA walkway including dense graded aggregate sub-base, and HMA base / surface course material; construction of approx. 6,000 SY +/- of new 8' wide / 10' wide HMA walkways including cutting / removal / disposal of existing asphalt walkways, dense graded aggregate sub-base, and HMA base / surface course material; furnishing / installation of approx. 150 SY +/- of HMA surface course material to overlay existing asphalt walkways to remain; furnishing / installation of topsoil and seed; Borough property restoration, and all other preparation, restoration and associated work.
Posted Date
Feb 15, 2026
Due Date
Mar 10, 2026
Release: Feb 15, 2026
Borough of Sayreville
Close: Mar 10, 2026
upgrading the existing asphalt / concrete walkways located within the Kennedy Park property of the Borough. The work includes soil erosion / sediment control measures; removal of existing granite block / concrete curb and replacement with approx. 100 LF +/- of standard concrete curb; removal of approx. 11,000 SF +/- of existing concrete sidewalks, slabs and/or driveway aprons; construction of approx. 250 SF +/- of 6" thick reinforced concrete sidewalk / apron, and construction of approx. 2,500 SF +/- of 4" thick reinforced concrete sidewalk with cast-in-place handicapped sidewalk ramp delineations; construction of approx. 2,200 SY +/- of new 8' wide HMA walkway including dense graded aggregate sub-base, and HMA base / surface course material; construction of approx. 6,000 SY +/- of new 8' wide / 10' wide HMA walkways including cutting / removal / disposal of existing asphalt walkways, dense graded aggregate sub-base, and HMA base / surface course material; furnishing / installation of approx. 150 SY +/- of HMA surface course material to overlay existing asphalt walkways to remain; furnishing / installation of topsoil and seed; Borough property restoration, and all other preparation, restoration and associated work.
Sayreville Housing Authority
Emergency Call and Fire Alarm Systems Inspection, Maintenance and Repair Services.
Posted Date
Jan 27, 2026
Due Date
Feb 10, 2026
Release: Jan 27, 2026
Sayreville Housing Authority
Close: Feb 10, 2026
Emergency Call and Fire Alarm Systems Inspection, Maintenance and Repair Services.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $17,500, use sole source.
Coops: Lead with a cooperative purchase (Sourcewell, HGACBuy, ESCNJ, or NJ State Contract). Confirm the vehicle with the Purchasing Agent and route for council approval.
Borough of Sayreville, NJ. Viable when the product is specialized or supports operational maintenance (e.g., sewer system).
Track vendor wins and renewal opportunities
Borough of Sayreville
The Borough of Sayreville awarded 14 professional service contracts to various legal, financial, planning, engineering, and architectural firms for a one-year term spanning the entirety of 2026. The contracts cover a range of services from general legal counsel to specialized matters and municipal planning.
Effective Date
Jan 1, 2026
Expires
Effective: Jan 1, 2026
Borough of Sayreville
Expires:
The Borough of Sayreville awarded 14 professional service contracts to various legal, financial, planning, engineering, and architectural firms for a one-year term spanning the entirety of 2026. The contracts cover a range of services from general legal counsel to specialized matters and municipal planning.
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from Borough of Sayreville
The meeting included the review and approval of an application from Zbigniew Smagacz (#26-02) seeking variances, primarily a bulk variance for the installation of an in-ground pool, requiring adjustments to the standard 10-foot setback due to a two-level yard configuration. The Board also proceeded with the formal memorialization of previous resolutions, specifically for applications #25-14 (EPIC Church), #25-15 (Lestuck Properties, LLC), and #25-23 (Salvatore Reno). The proceedings concluded with an adjournment after the minutes from the December 10, 2025 meeting were accepted.
The meeting commenced with a roll call establishing a quorum. Key discussion points included a consistency review for the Hercules Redevelopment Plan 2, specifically focusing on five parcels within the former Sunshine Biscuit site, which relates to the borough's NJSA4A 12A7E ordinance. The presentation detailed how the plan aligns with the 2013 Master Plan, the 2023 Master Plan Re-examination Report, and the 2023 Land Use Element, addressing goals related to aesthetics, permitted uses, floor area ratio, visual environment, sustainability standards (including green infrastructure and EV charging), business community maintenance, and circulation/transportation planning. The plan proposes retaining current zoning for four smaller parcels while redeveloping the largest parcel into an SEDHR zone. The board also opened and closed a brief public session, during which no members of the public spoke, before adjourning.
The primary focus of the meeting was a consistency review for the Hercules Redevelopment Plan 2, which concerns five parcels, including the former Sunshine Biscuit site, totaling approximately 58 acres. The plan aims to be consistent with the borough's 2013 Master Plan, 2023 Master Plan Re-examination Report, and the 2023 Land Use Element. Discussion points included establishing design standards, bulk standards (setting the floor area ratio at 0.45, which curtails a previously suggested ratio), eliminating heavy industrial uses, and preserving environmentally sensitive areas. The plan incorporates green infrastructure requirements, such as LEED standards, EV charging stations, and consistency with updated stormwater ordinances. Significant attention was given to circulation, restricting vehicle access on Bordentown Avenue and setting specific rules for truck movement on Journey Mill Road. The board also reviewed the borough housing plan element and fair share plan as a presentation item.
The meeting included a confirmation that the session was advertised according to the sunshine law and established a quorum. Key discussion centered on planning board item 25-03, a preliminary and final site plan application by Caravan LLC for an approximately 9,300 square foot car wash, quick lube, and detailing business in the B3 zone. The plan involves four lube bays, three detailing bays, and one car wash tunnel. The applicant proposes dedicating property for the right-of-way dedication along Carney Road to normalize its width. The discussion covered required variances and waivers, specifically concerning parking (16 spaces proposed vs. 31 required), signage (three freestanding signs proposed vs. one permitted), and loading space dimensions. The engineer presented exhibits detailing existing conditions and the proposed site layout, noting compliance with storm water management requirements via an infiltration basin. Issues raised included the status of NJ DOT approval, environmental impact (noted as minimal since existing overgrown grass is being cleared), site grading drainage, and fire water pressure adequacy, which is pending confirmation from the water company. The feasibility of waste collection truck maneuverability was also addressed.
The meeting included a proclamation declaring January as Muslim American Heritage Month, celebrating the history and contributions of American Muslims in New Jersey and Sarville. A significant portion of the discussion focused on the repurposing of a historic 1909 building (original Borough Hall, former firehouse and police station) following a successful referendum. Architects presented schematic floor plans for the renovation, emphasizing the need to meet modern ADA accessibility standards, including adding an elevator and ramps, which necessitates a structural study. The discussion also touched upon the poor condition of current municipal office trailers, citing instances of water leaks and general disrepair, which reinforces the need for the building renovation project. The architects noted that while efforts were made to preserve historical elements like existing jail cells in the basement, many interior features were deemed unsalvageable due to hazardous materials and code compliance issues.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Borough of Sayreville's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database