Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Borough of Herndon
Work includes demo men/women bathroom; frame out bathroom to meet ada compliance; move steel frame door opening to center of wall to have an opening of 36"; remove old tile flooring; install new drywall plus frp board; install new tile floor; install trim; install new toilet; install new stink; install 6 led lights/switch/receptables; paint, remove cmu bearing wall and install new lvl beam and borough has drawings for ada new bathroom. .
Posted Date
Dec 4, 2025
Due Date
Mar 3, 2026
Release: Dec 4, 2025
Borough of Herndon
Close: Mar 3, 2026
Work includes demo men/women bathroom; frame out bathroom to meet ada compliance; move steel frame door opening to center of wall to have an opening of 36"; remove old tile flooring; install new drywall plus frp board; install new tile floor; install trim; install new toilet; install new stink; install 6 led lights/switch/receptables; paint, remove cmu bearing wall and install new lvl beam and borough has drawings for ada new bathroom. .
AvailableBorough of Herndon
Work include remove lighting above garage doors remove/replace/install two windows at front entrance install insulation board on whole exterior of building install metal panels on whole exterior of building install coil stock around the top of the building install new vent pipe install aprox. 15"-16" of gutter on the backside of the building.
Posted Date
-
Due Date
Aug 5, 2025
Release: -
Borough of Herndon
Close: Aug 5, 2025
Work include remove lighting above garage doors remove/replace/install two windows at front entrance install insulation board on whole exterior of building install metal panels on whole exterior of building install coil stock around the top of the building install new vent pipe install aprox. 15"-16" of gutter on the backside of the building.
Borough of Herndon
Provide and place approx 160 TN of asphalt wearing course; 240 TN of asphalt binder course, base repair; 72 TN of 2a subbase and preform; 254 SY of milling asphalt pavement surface.
Posted Date
Mar 11, 2025
Due Date
Apr 7, 2025
Release: Mar 11, 2025
Borough of Herndon
Close: Apr 7, 2025
Provide and place approx 160 TN of asphalt wearing course; 240 TN of asphalt binder course, base repair; 72 TN of 2a subbase and preform; 254 SY of milling asphalt pavement surface.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Borough of Herndon's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Borough of Herndon's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database