Beech Island Avenue: Tank One To Tank Four (Design-Bid-Build)
Posted
-
Sep 29, 2026
Work includes approx 11,700 LF of 12" water line to replace the existing water line. Project includes the installation of valves, hydrants and all appurtenances and the abandonment of the existing water lines.
