North Water Extension Project RFP
Posted
Oct 5, 2026
Oct 27, 2026
Project includes directional boring installation of HDPE drinking main water supply conduits of varying sizes at a total length of approx 43,391 horizontal LF and 186 taps with 14 fire hydrants and 2 flush hydrants. The base bid project also includes a complete water pressure booster station with site improvements and a commercial two-lane water filling station. Bid alternate #1 project includes a commercial single lane water filling station.

