Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Michigan City
Provide zoo wings of wonder exhibit expansion.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Welaka
Work includes construct a new 0.125 MGD conventional wastewater treatment facility (WWTF), which will include: concrete influent structure with static screen, cyclone grit removal, and flow splitting; two (2) 0.125 MGD ADF package biological treatment units (BTU No. 1) consisting of pre-anoxic, aeration, post-anoxic, re-aeration, clarification, and digester compartments each within a prestressed concrete tank; associated process pumps and blowers located outside the BTU tankage; two (2) disk-type filters in stainless steel tankage; chlorine contact chamber with two isolatable compartments constructed of poured-in-place concrete influent pump station modifications; in-plant reuse pump station; chemical feed and storage facilities; operations/control building;; modification of the existing on-site rapid infiltration basins (RIBs); yard piping; sitework; electrical/instrumentation and SCADA, including new emergency generator; associated restoration; and the demolition of the existing 0.100 MGD WWTF. Additive Alternates, which include additional WWTF upgrades and expanded treatment capacity via BTU No. 2, may be included in the project based on available budget.
Posted Date
Sep 3, 2025
Due Date
Dec 16, 2025
Release: Sep 3, 2025
Town of Welaka
Close: Dec 16, 2025
Work includes construct a new 0.125 MGD conventional wastewater treatment facility (WWTF), which will include: concrete influent structure with static screen, cyclone grit removal, and flow splitting; two (2) 0.125 MGD ADF package biological treatment units (BTU No. 1) consisting of pre-anoxic, aeration, post-anoxic, re-aeration, clarification, and digester compartments each within a prestressed concrete tank; associated process pumps and blowers located outside the BTU tankage; two (2) disk-type filters in stainless steel tankage; chlorine contact chamber with two isolatable compartments constructed of poured-in-place concrete influent pump station modifications; in-plant reuse pump station; chemical feed and storage facilities; operations/control building;; modification of the existing on-site rapid infiltration basins (RIBs); yard piping; sitework; electrical/instrumentation and SCADA, including new emergency generator; associated restoration; and the demolition of the existing 0.100 MGD WWTF. Additive Alternates, which include additional WWTF upgrades and expanded treatment capacity via BTU No. 2, may be included in the project based on available budget.
AvailablePocono Township
Learn Road Roundabout Project.
Posted Date
Mar 7, 2025
Due Date
Dec 10, 2025
Release: Mar 7, 2025
Pocono Township
Close: Dec 10, 2025
Learn Road Roundabout Project.
AvailableCity of Artesia
The project includes electric vehicle charging facility expansion.
Posted Date
Nov 4, 2025
Due Date
Dec 16, 2025
Release: Nov 4, 2025
City of Artesia
Close: Dec 16, 2025
The project includes electric vehicle charging facility expansion.
AvailableConnecticut Science Center
Seeking qualified contractors to design a new 5,000sqft immersive dinosaur exhibit. The firm selected will be responsible for the refinement and finalization of exhibition concepts, development of schematic designs, detailed designs, and construction documents. The firm will provide project management services from conception to installation including supporting the bid process for procurement of other goods & services as required.
Posted Date
Nov 17, 2025
Due Date
Dec 19, 2025
Release: Nov 17, 2025
Connecticut Science Center
Close: Dec 19, 2025
Seeking qualified contractors to design a new 5,000sqft immersive dinosaur exhibit. The firm selected will be responsible for the refinement and finalization of exhibition concepts, development of schematic designs, detailed designs, and construction documents. The firm will provide project management services from conception to installation including supporting the bid process for procurement of other goods & services as required.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis