Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Bureau of Land Management (Montana State Office) issued Solicitation 140L3626Q0001 for the White Sandy Campground Water Filtration project to provide and install water filtration equipment at White Sandy Campground in Lewis and Clark County (Helena), Montana, addressing iron, total dissolved solids, sulfate and hardness. The contract is a Small Business set-aside (NAICS 221310) with an estimated performance period from 2026-03-15 to 2026-10-31 and an estimated value range of $50,000$150,000 (AI estimate). Offers are due Jan 19, 2026 (5:00 PM MST) and the opportunity is listed as Active on SAM.gov (original source).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide campground water filtration services.
Posted Date
Dec 12, 2025
Due Date
Jan 19, 2026
Release: Dec 12, 2025
Close: Jan 19, 2026
Provide campground water filtration services.
AvailableWork shall consist of work related to the construction of a bathhouse and utilities for a new RV campground loop and bathhouse.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Work shall consist of work related to the construction of a bathhouse and utilities for a new RV campground loop and bathhouse.
AvailableRelease: Jan 2, 2026
Close: Jan 27, 2026
Revolutionary war campground study.
AvailableDemolition of the water filtration plant; construction of a new intermediate and high lift pump station (IHLPS) on the site of the demolished center clearwell; construction of a new south reservoir on the site of the demolished south clearwell; construction of a new north reservoir on the site of the demolished north clearwell; installation of new WFP emergency generators and generators' switchgear; replacement of low lift pumps and piping, electrical systems, and building mechanical systems in the LL-HSPS; replacement of low lift pump drives in the backup low lift pump station; installation of flow meter vault improvements; installation of CT/BWS basin improvements; installation of buried piping and electrical ductbank; installation of modifications to the WFP supervisory control and data acquisition (SCADA) system; installation of a new storm water outfall to lake; WFP site fencing, surface restoration and landscaping.
Posted Date
Nov 26, 2025
Due Date
Jan 22, 2026
Release: Nov 26, 2025
Close: Jan 22, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolition of the water filtration plant; construction of a new intermediate and high lift pump station (IHLPS) on the site of the demolished center clearwell; construction of a new south reservoir on the site of the demolished south clearwell; construction of a new north reservoir on the site of the demolished north clearwell; installation of new WFP emergency generators and generators' switchgear; replacement of low lift pumps and piping, electrical systems, and building mechanical systems in the LL-HSPS; replacement of low lift pump drives in the backup low lift pump station; installation of flow meter vault improvements; installation of CT/BWS basin improvements; installation of buried piping and electrical ductbank; installation of modifications to the WFP supervisory control and data acquisition (SCADA) system; installation of a new storm water outfall to lake; WFP site fencing, surface restoration and landscaping.
Available