Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes construction services to upgrade the boiler control system. Replace the existing PLC with a CompactLogix 5000 Series PLC and 5069 I/O modules.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
Posted Date
Oct 28, 2025
Due Date
Feb 27, 2026
Release: Oct 28, 2025
Close: Feb 27, 2026
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace and upgrade steam safety valves within the steam boiler system in Building 75 at the Jefferson Barracks VA. Existing steam safety valves found within the steam boiler system in Building 75 are in need of replacement and upgrading so to improve facility safety and efficiency. To do so, this Scope of Work (SOW) will address a total of eight steam safety valves, which is comprised of two steam safety valves per each of the three separate boilers, one safety valve following the PRV station upstream of the deaerator, and one deaerator safety valve. All new work and equipment shall comply with VHA Directive 1810. The following outlines the SOW for the different valve types, with respect to their adjacent structure/function: a. Steam Safety Valves on Boiler (SVB) SOW: Removal of two existing SVB per each of the three separate boilers, totally in six SVB to be removed. Installation of two new SVB per each of the three separate boilers, totaling in six SVB to be installed. All new SVB being installed will require flange reducers 2½ x 4 flange reducers, properly upsized drip 90 bowl/cups, upgraded A193 flange steam bolts, and other related materials to complete their proper installation. For all new SVB being installed, steam escape piping contiguous with drip 90 bowl/cup and/or vertically extending upwards through the roof of Building 75 may require modification. For each of the three separate boilers, the two new SVB being installed are to be similar but have unique specifications, as outlined below: SVB type 1: Relieve Boiler Steam at 130 psi (Set Point) Relieve 80% of total steam capacity of 35,000 lbs/hr, or 28,000 lbs/hr SVB shall be constructed of Cast Steel SVB type 2: Relieve Boiler Steam at 135 psi / Set Point Relieve 100% total steam capacity of 35,000 lbs/hr, or 35,000 lbs/hr SVB shall be constructed of Cast Steel b. Safety Valve Following PRV (SVFPRV) SOW: The existing SVFPRV, located upstream of the Deaerator, is to be removed. In its place, a new Kunkle is to be installed. Its installation will require newly upgraded A193 flange steam bolts and other related materials to complete proper installation. The new Kunkle being installed must meet the following specifications: Relieve steam at 15 psi (Set Point) Relieve steam capacity of 17,972 lbs/hr Shall be constructed of Cast Steel c. Deaerator Safety Valve (DASV) SOW: The existing DASV is to be removed. In its place, a new DASV is to be installed, which must meet the following specifications: Relieve steam at 15 psi (Set Point) Relieve steam capacity of 2,990 lbs/hr. The acceptable relief steam capacity is 500 lbs/hr to 1,000 lbs/hr. Shall be constructed of Cast Steel The contractor shall furnish all labor, supervision, materials, products, tools, equipment, temporary structures (including scaffolding), and any other resources necessary to complete the work as described in this SOW.
Posted Date
Dec 8, 2025
Due Date
Jan 15, 2026
Release: Dec 8, 2025
Close: Jan 15, 2026
Replace and upgrade steam safety valves within the steam boiler system in Building 75 at the Jefferson Barracks VA. Existing steam safety valves found within the steam boiler system in Building 75 are in need of replacement and upgrading so to improve facility safety and efficiency. To do so, this Scope of Work (SOW) will address a total of eight steam safety valves, which is comprised of two steam safety valves per each of the three separate boilers, one safety valve following the PRV station upstream of the deaerator, and one deaerator safety valve. All new work and equipment shall comply with VHA Directive 1810. The following outlines the SOW for the different valve types, with respect to their adjacent structure/function: a. Steam Safety Valves on Boiler (SVB) SOW: Removal of two existing SVB per each of the three separate boilers, totally in six SVB to be removed. Installation of two new SVB per each of the three separate boilers, totaling in six SVB to be installed. All new SVB being installed will require flange reducers 2½ x 4 flange reducers, properly upsized drip 90 bowl/cups, upgraded A193 flange steam bolts, and other related materials to complete their proper installation. For all new SVB being installed, steam escape piping contiguous with drip 90 bowl/cup and/or vertically extending upwards through the roof of Building 75 may require modification. For each of the three separate boilers, the two new SVB being installed are to be similar but have unique specifications, as outlined below: SVB type 1: Relieve Boiler Steam at 130 psi (Set Point) Relieve 80% of total steam capacity of 35,000 lbs/hr, or 28,000 lbs/hr SVB shall be constructed of Cast Steel SVB type 2: Relieve Boiler Steam at 135 psi / Set Point Relieve 100% total steam capacity of 35,000 lbs/hr, or 35,000 lbs/hr SVB shall be constructed of Cast Steel b. Safety Valve Following PRV (SVFPRV) SOW: The existing SVFPRV, located upstream of the Deaerator, is to be removed. In its place, a new Kunkle is to be installed. Its installation will require newly upgraded A193 flange steam bolts and other related materials to complete proper installation. The new Kunkle being installed must meet the following specifications: Relieve steam at 15 psi (Set Point) Relieve steam capacity of 17,972 lbs/hr Shall be constructed of Cast Steel c. Deaerator Safety Valve (DASV) SOW: The existing DASV is to be removed. In its place, a new DASV is to be installed, which must meet the following specifications: Relieve steam at 15 psi (Set Point) Relieve steam capacity of 2,990 lbs/hr. The acceptable relief steam capacity is 500 lbs/hr to 1,000 lbs/hr. Shall be constructed of Cast Steel The contractor shall furnish all labor, supervision, materials, products, tools, equipment, temporary structures (including scaffolding), and any other resources necessary to complete the work as described in this SOW.
Release: Nov 13, 2025
Close: Dec 30, 2025
Chiller capacity and controls upgrade.
AvailableUpgrading and optimizing building control systems from pneumatic or manual controls to digital controls in an efficient and scalable manner.
Posted Date
Oct 29, 2025
Due Date
Jan 30, 2026
Release: Oct 29, 2025
Close: Jan 30, 2026
Upgrading and optimizing building control systems from pneumatic or manual controls to digital controls in an efficient and scalable manner.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →