Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This is a presolicitation synopsis for a firm-fixed-price construction contract to replace boilers and controls at the Federal Correctional Institution (FCI) Pekin in Pekin, Illinois. The work includes removing existing boilers, piping, tanks, and installing new boilers, pumps, controls and ensuring compatibility with existing Siemens systems; performance period is 120 calendar days. The opportunity is a 100% small business set-aside with an estimated magnitude of $1,000,000 – $5,000,000 and the solicitation was scheduled to be posted on SAM.gov in early January 2026.
Posted Date
Dec 10, 2025
Due Date
Jan 9, 2026
Release: Dec 10, 2025
Close: Jan 9, 2026
This is a presolicitation synopsis for a firm-fixed-price construction contract to replace boilers and controls at the Federal Correctional Institution (FCI) Pekin in Pekin, Illinois. The work includes removing existing boilers, piping, tanks, and installing new boilers, pumps, controls and ensuring compatibility with existing Siemens systems; performance period is 120 calendar days. The opportunity is a 100% small business set-aside with an estimated magnitude of $1,000,000 – $5,000,000 and the solicitation was scheduled to be posted on SAM.gov in early January 2026.
Premium
Access the largest public sector contact database
Replace boilers & controls. This project would involve draining the system, removing existing boiler, removing hot water supply and return piping as required, disconnecting existing main power and gas piping, provide and install new Aldrich or like boiler, removing existing expansion tanks and providing and installing new expansion tank, provide and install new hot water supply and return piping as required by installation, provide and install new boiler pump, provide and install new low water cutoffs and safeties, provide and install new flew connections as required, reconnect existing main power wiring and gas piping, and provide startup and testing. See attached file.
Posted Date
Dec 10, 2025
Due Date
Jan 9, 2026
Release: Dec 10, 2025
Close: Jan 9, 2026
Replace boilers & controls. This project would involve draining the system, removing existing boiler, removing hot water supply and return piping as required, disconnecting existing main power and gas piping, provide and install new Aldrich or like boiler, removing existing expansion tanks and providing and installing new expansion tank, provide and install new hot water supply and return piping as required by installation, provide and install new boiler pump, provide and install new low water cutoffs and safeties, provide and install new flew connections as required, reconnect existing main power wiring and gas piping, and provide startup and testing. See attached file.
AvailableRelease: Nov 13, 2025
Close: Dec 30, 2025
Chiller capacity and controls upgrade.
AvailableSeeking contract for electrical work, replace lighting & controls,
Posted Date
Nov 18, 2025
Due Date
Jan 7, 2026
Release: Nov 18, 2025
Close: Jan 7, 2026
Seeking contract for electrical work, replace lighting & controls,
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis