CityMN
Jul 16, 2026
Closes
Aug 26, 2026
West Creek Substation T2 Transformer
Provide one (1) new three-phase power substation transformer.
Description: The Western Area Power Administration (WAPA), a Department of Energy bureau, issued this sealed-bid Invitation for Bid (Solicitation 89503226BWA000073) for the Glendo-Lusk Rural Tap 115kV Transmission Line Upgrade and the new Quinn Creek Substation project in Platte and Niobrara counties, Wyoming. The 100% small business set-aside construction contract covers replacement of roughly 35 miles of an existing 69-kV line with a new 115-kV wood-pole H-frame line and construction of the new Quinn Creek Substation on about 5 acres. Performance is 800 calendar days after Notice to Proceed or by December 2028, with an estimated construction magnitude over $10 million, NAICS 237130, and bids submitted via FedConnect.
SpecialDistrict · CO, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to Western Area Power Administration (WAPA).
These related opportunities are still open for bidding.
CityMN
Jul 16, 2026
Closes
Aug 26, 2026
Provide one (1) new three-phase power substation transformer.
Greenville Electric Utility System (GEUS)
Special DistrictTX
Aug 5, 2026
Closes
Sep 1, 2026
Power Lane II Substation and GNIN Substation.
CityIA
Jul 16, 2026
Closes
Aug 25, 2026
Installation of concrete foundations, conduit, ground grid, control cable, fencing, and miscellaneous equipment at the power plant substation and south substation. Description: 1 ea of master microgrid control panel installations; 75 ft of fiber optic cable, single mode; 75 ft of fiber optic cable, multi mode; 50 ft of conduit, 2" pvc; 2100 ft of conduit, 3" pvc; 200 ft of conduit, 5" pvc; 50 ft of control raceway (6) 3" pvc; 1 ea of foundation, control enclosure; 1 ea of concrete cover, existing switchgear basement; 50 cy of building excavation; 50 cy of imported building embankment; 620 sy of 12" subgrade prepartion; 225 ton of rock surfacing; 2 ea of removal, switchgear, outdoor metal-clad; 75 ft of fiber optic cable, single mode. See attached file.
CityMN
Jul 16, 2026
Closes
Aug 25, 2026
Montezuma Light & Power is soliciting construction work for the Power Plant Substation and the South Substation, including concrete foundations, conduit, ground grid, control cable, fencing, and miscellaneous equipment. The procurement is estimated in the mid-six-figure to low seven-figure range and is being administered through the project planroom (QuestCDN) by the project's engineer/solicitor. Proposals are due Aug 25, 2026 at 1:30 PM CDT.