Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes addition of a UV disinfection system including a pump station, a cast-in-place concrete in ground tank, a shelter structure, and a precast concrete flow equalization tank.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Jan 2, 2026
Close: Feb 3, 2026
WWTP Expansion & Major Upgrades.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Southampton County, Virginia, is seeking bids for an Invitation for Bid (IFB) regarding wastewater treatment plant (WWTP) upgrades and improvements with a substantial infrastructure renovation project. The procurement opportunity focuses on comprehensive upgrades to the existing 4.0 MGD treatment facility, with specific improvements targeting pretreatment, primary and secondary clarifiers, and the shop building. Key project deliverables include replacing screening and grit equipment, upgrading pumps and blowers with variable frequency drives (VFDs), installing new flow meters and samplers, rehabilitating clarifier access bridges, and modernizing electrical systems.
Posted Date
Dec 29, 2025
Due Date
Jan 12, 2026
Release: Dec 29, 2025
Close: Jan 12, 2026
Southampton County, Virginia, is seeking bids for an Invitation for Bid (IFB) regarding wastewater treatment plant (WWTP) upgrades and improvements with a substantial infrastructure renovation project. The procurement opportunity focuses on comprehensive upgrades to the existing 4.0 MGD treatment facility, with specific improvements targeting pretreatment, primary and secondary clarifiers, and the shop building. Key project deliverables include replacing screening and grit equipment, upgrading pumps and blowers with variable frequency drives (VFDs), installing new flow meters and samplers, rehabilitating clarifier access bridges, and modernizing electrical systems.
AvailableThis IFB, issued by Lehigh County Authority, seeks electrical equipment for the Kline's Island WWTP wet weather upgrades. The scope includes providing shop drawings, O&M manuals, furnishing and delivering electrical equipment to the plant site. Additionally, the selected vendor will provide support services such as installation supervision, testing, and training as specified in the contract documents.
Posted Date
Dec 10, 2025
Due Date
Jan 20, 2026
Release: Dec 10, 2025
Close: Jan 20, 2026
This IFB, issued by Lehigh County Authority, seeks electrical equipment for the Kline's Island WWTP wet weather upgrades. The scope includes providing shop drawings, O&M manuals, furnishing and delivering electrical equipment to the plant site. Additionally, the selected vendor will provide support services such as installation supervision, testing, and training as specified in the contract documents.
AvailableProject generally consists of improvements to the existing pretreatment building including replacement of screening equipment, grit equipment, pumps and blowers (including vfds), influent sampler(s), flow meter(s), gates and valves, and associated piping along with renovation of existing pre-engineered metal building (including hvac improvements), installation of new bollards, and electrical improvements; See attached file.
Posted Date
Dec 3, 2025
Due Date
Jan 26, 2026
Release: Dec 3, 2025
Close: Jan 26, 2026
Project generally consists of improvements to the existing pretreatment building including replacement of screening equipment, grit equipment, pumps and blowers (including vfds), influent sampler(s), flow meter(s), gates and valves, and associated piping along with renovation of existing pre-engineered metal building (including hvac improvements), installation of new bollards, and electrical improvements; See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →