Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide one screw press or one belt press, with optional equipment, two sludge pumps, two dumpster conveyors.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Indian River County is seeking a contractor to operate the Biosolids Dewatering Facility located at 1350 74th Avenue SW in Vero Beach, Florida. The contractor must process approximately 14 million gallons of sludge annually. The bid opening is scheduled for January 21, 2026, at 2:00 PM, with electronic submissions required through the Bonfire platform.
Posted Date
Dec 23, 2025
Due Date
Jan 21, 2026
Release: Dec 23, 2025
Close: Jan 21, 2026
Indian River County is seeking a contractor to operate the Biosolids Dewatering Facility located at 1350 74th Avenue SW in Vero Beach, Florida. The contractor must process approximately 14 million gallons of sludge annually. The bid opening is scheduled for January 21, 2026, at 2:00 PM, with electronic submissions required through the Bonfire platform.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Soldotna is soliciting bids for Wastewater Treatment Plant Dewatering Improvements. The project includes temporary modification/operation of dewatering, construction of a new dewatering building, installation and commissioning support for owner-procured centrifuges, and associated piping, valves, electrical, controls, and site/civil improvements. Work also includes yard piping and site grading/paving improvements to deliver a complete and functional system.
Posted Date
-
Due Date
Feb 11, 2026
Release: -
Close: Feb 11, 2026
The City of Soldotna is soliciting bids for Wastewater Treatment Plant Dewatering Improvements. The project includes temporary modification/operation of dewatering, construction of a new dewatering building, installation and commissioning support for owner-procured centrifuges, and associated piping, valves, electrical, controls, and site/civil improvements. Work also includes yard piping and site grading/paving improvements to deliver a complete and functional system.
AvailableGreat Lakes Water Authority is soliciting bids for improvements to the Water Resource Recovery Facility (WRRF) sludge feed system used for solids processing, including associated construction and related work. Bidders must submit required documents (e.g., bid bond, vendor certifications) via the Bonfire portal by the stated Close Date.
Posted Date
Oct 20, 2025
Due Date
Jan 9, 2026
Release: Oct 20, 2025
Close: Jan 9, 2026
Great Lakes Water Authority is soliciting bids for improvements to the Water Resource Recovery Facility (WRRF) sludge feed system used for solids processing, including associated construction and related work. Bidders must submit required documents (e.g., bid bond, vendor certifications) via the Bonfire portal by the stated Close Date.
AvailableWork includes installation of new or replacement of existing pumps integral to the main process train (preferably for sludge pumping application in an existing wastewater treatment facility) b. Installation of process piping system above and underground (preferably for pressurized fluid conveyance within the existing wastewater treatment facility) c. Maintenance of facility operation throughout the construction duration.
Posted Date
Oct 20, 2025
Due Date
Jan 9, 2026
Release: Oct 20, 2025
Close: Jan 9, 2026
Work includes installation of new or replacement of existing pumps integral to the main process train (preferably for sludge pumping application in an existing wastewater treatment facility) b. Installation of process piping system above and underground (preferably for pressurized fluid conveyance within the existing wastewater treatment facility) c. Maintenance of facility operation throughout the construction duration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.