Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project includes the following Work Installation of new blowers, MCC, and HVAC equipment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Decommissioning, removal and disposal of a 600 HP Hoffman, multistage centrifugal blower. Once existing blower is removed, the contractor is required to install the owner supplied blower. The contractor is required supply the coordination, installation, valves, piping, services, and commissioning of the replacement blower and all related appurtenances.
Posted Date
Jan 6, 2026
Due Date
Mar 5, 2026
Release: Jan 6, 2026
Close: Mar 5, 2026
Decommissioning, removal and disposal of a 600 HP Hoffman, multistage centrifugal blower. Once existing blower is removed, the contractor is required to install the owner supplied blower. The contractor is required supply the coordination, installation, valves, piping, services, and commissioning of the replacement blower and all related appurtenances.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Meridian issued an Invitation to Bid (ITB) PW-2606-11178.C for removal of the existing annular gas seal and supplying, installing, and testing a new annular gas seal for Digester 5. The opportunity opened on 2025-12-05 and closes on 2026-01-21 at 2:30 PM MST; key events include a pre-bid meeting on 2026-01-07 and questions due by 2026-01-13. Supporting documents (ITB cover, general conditions, technical specifications, drawings, contract terms, and bid forms) are listed on the City of Meridians Bonfire portal but require a Bonfire account to download.
Posted Date
Dec 5, 2025
Due Date
Jan 21, 2026
Release: Dec 5, 2025
Close: Jan 21, 2026
The City of Meridian issued an Invitation to Bid (ITB) PW-2606-11178.C for removal of the existing annular gas seal and supplying, installing, and testing a new annular gas seal for Digester 5. The opportunity opened on 2025-12-05 and closes on 2026-01-21 at 2:30 PM MST; key events include a pre-bid meeting on 2026-01-07 and questions due by 2026-01-13. Supporting documents (ITB cover, general conditions, technical specifications, drawings, contract terms, and bid forms) are listed on the City of Meridians Bonfire portal but require a Bonfire account to download.
AvailableProject consists of the removal of the district's current digester no. 1 cover and replacing it with a new digester cover. This includes removal and re-installation of the existing linear motion mixing equipment, and the replacement of the drive for the mixing equipment. The project includes emptying and cleaning of digester no. 1. The project will also consist of associated site work, structural, building components, electrical work, instrumentation and controls as specified herein.
Posted Date
Dec 2, 2025
Due Date
Jan 14, 2026
Release: Dec 2, 2025
Close: Jan 14, 2026
Project consists of the removal of the district's current digester no. 1 cover and replacing it with a new digester cover. This includes removal and re-installation of the existing linear motion mixing equipment, and the replacement of the drive for the mixing equipment. The project includes emptying and cleaning of digester no. 1. The project will also consist of associated site work, structural, building components, electrical work, instrumentation and controls as specified herein.
AvailableRemoval of the existing annular gas seal between the lid and the wall of Digester 5 and supply, installation and testing of a new annular gas seal.
Posted Date
Mar 20, 2025
Due Date
Jan 21, 2026
Release: Mar 20, 2025
Close: Jan 21, 2026
Removal of the existing annular gas seal between the lid and the wall of Digester 5 and supply, installation and testing of a new annular gas seal.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →