Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Palm Coast seeks a contractor to furnish all labor, materials and equipment to install approximately 955 feet of 8" HDPE and 965 feet of 6" PVC raw water main pipe, including three directional drills, valves, connections, restoration, equipping two potable water supply wells, and providing two generators. The solicitation (ITB-UT-26-07) is open from Nov 12, 2025 to Jan 8, 2026. Supporting documents and addenda are listed on the posting but require Bonfire login to download.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Furnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main pipe. Also included are three (3) directional drills, valves, connections, restoration, the equipping of two (2) potable water supply wells and providing two (2) generators.
Posted Date
Nov 12, 2025
Due Date
Jan 8, 2026
Release: Nov 12, 2025
Close: Jan 8, 2026
Furnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main pipe. Also included are three (3) directional drills, valves, connections, restoration, the equipping of two (2) potable water supply wells and providing two (2) generators.
AvailableFurnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main pipe. Also included are three (3) directional drills, valves, connections, restoration, the equipping of two (2) potable water supply wells and providing two (2) generators.
Posted Date
Nov 12, 2025
Due Date
Jan 8, 2026
Release: Nov 12, 2025
Close: Jan 8, 2026
Furnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main pipe. Also included are three (3) directional drills, valves, connections, restoration, the equipping of two (2) potable water supply wells and providing two (2) generators.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis