CityGA
Jul 29, 2026
Closes
Sep 3, 2026
Wrens Well #107 RFP
Installation of a 12", gravel pack well, pump, generator, electrical, and chemical building including chemical feed system and 634 LF of 12" water line and all appurtenances.
Description: The City of Wrens, Georgia is soliciting bids for the Wrens Well #107 project, which involves the installation of a 12-inch gravel pack well, pump, generator, electrical work, chemical building, chemical feed system, and 634 linear feet of 12-inch water line along with all appurtenances. The project is proposed to be funded with a State Revolving Fund (SRF) loan, requiring compliance with all SRF, American Iron and Steel Special Conditions, and Build America, Buy America requirements. Construction time allotted is 270 consecutive calendar days for final completion, with paper responses due by September 3, 2026 at 10:00 AM ET.
City · GA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityGA
Jul 29, 2026
Closes
Sep 3, 2026
Installation of a 12", gravel pack well, pump, generator, electrical, and chemical building including chemical feed system and 634 LF of 12" water line and all appurtenances.
CityGA
Jul 29, 2026
Closes
Sep 3, 2026
The City of Wrens, Georgia is soliciting bids for the Wrens Well #107 project, which involves the installation of a 12-inch gravel pack well, pump, generator, electrical work, chemical building, chemical feed system, and 634 linear feet of 12-inch water line along with all appurtenances. The project is proposed to be funded with a State Revolving Fund (SRF) loan, requiring compliance with all SRF, American Iron and Steel Special Conditions, and Build America, Buy America requirements. Construction time allotted is 270 consecutive calendar days for final completion, with paper responses due by September 3, 2026 at 10:00 AM ET.
CitySC
Jul 20, 2026
Closes
Aug 18, 2026
Perform well testing services for an existing drinking water supply well including but not limited to, brushing and bailing, video inspection, 24-hr pump drawdown testing, and water quality testing.
Chelan County Public Utility District
Special DistrictWA
Jul 29, 2026
Closes
Aug 18, 2026
Decommission seven (7) wells at five (5) Work Sites within Chelan County, Washington. The wells are to be decommissioned by a licensed well driller in conformance with WAC 173-160-381 with the site conditions restored to match the adjacent area.
Procurement and program contacts connected to City of Wrens.