Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This solicitation titled 'WRC: COSDS Interceptor Rehabilitation Area 1' requests civil engineering/construction services for rehabilitation of the COSDS interceptor in Michigan. The official posting shows bids opened 2025-12-05 and close 2026-02-10 at 02:00 PM EST; bid documents and buyer contact are available on the official posting but require vendor registration to view. This is a procurement (NAICS 237110, civil engineering) and is open as of 2025-12-27.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
DC Water issued a Request for Information (RFI) for the Potomac Interceptor Rehabilitation / Potomac Interceptor Project seeking responses from qualified design and construction firms experienced with large-diameter conveyance rehabilitation and maintenance-of-flow during construction. The project will be performed in the District of Columbia and aims to enhance reliability and efficiency of the wastewater conveyance system. The posting estimates an overall project value range and invites Letters of Interest and responses to support project planning.
Posted Date
Dec 11, 2025
Due Date
Jan 27, 2026
Release: Dec 11, 2025
Close: Jan 27, 2026
DC Water issued a Request for Information (RFI) for the Potomac Interceptor Rehabilitation / Potomac Interceptor Project seeking responses from qualified design and construction firms experienced with large-diameter conveyance rehabilitation and maintenance-of-flow during construction. The project will be performed in the District of Columbia and aims to enhance reliability and efficiency of the wastewater conveyance system. The posting estimates an overall project value range and invites Letters of Interest and responses to support project planning.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of rehabilitating the sanitary sewer system by performing cure-in-place pipe lining, manhole rehabilitation and restoration as shown on the plans and described in the specifications. This work shall include all labor, materials, supplies, transportation, equipment, and services necessary and required to perform the project. See outside link.
Posted Date
Dec 8, 2025
Due Date
Feb 24, 2026
Release: Dec 8, 2025
Close: Feb 24, 2026
Project consists of rehabilitating the sanitary sewer system by performing cure-in-place pipe lining, manhole rehabilitation and restoration as shown on the plans and described in the specifications. This work shall include all labor, materials, supplies, transportation, equipment, and services necessary and required to perform the project. See outside link.
AvailableWork consists of rehabilitation and/or replacement of 6" and 8" sewer mains, approx 13,311 LF by pipe bursting and 994 LF by open-cut. Also included rehabilitation or replacement of approx 368 lower laterals, 358 upper laterals, and approximately 60 sewer structures in the project area.
Posted Date
Nov 5, 2025
Due Date
Jan 13, 2026
Release: Nov 5, 2025
Close: Jan 13, 2026
Work consists of rehabilitation and/or replacement of 6" and 8" sewer mains, approx 13,311 LF by pipe bursting and 994 LF by open-cut. Also included rehabilitation or replacement of approx 368 lower laterals, 358 upper laterals, and approximately 60 sewer structures in the project area.
AvailableRehabilitation of two siphon structures and the CIPP lining of the pipes in-between the structures on interceptor 1-MN-310.
Posted Date
Sep 10, 2024
Due Date
Jan 20, 2026
Release: Sep 10, 2024
Close: Jan 20, 2026
Rehabilitation of two siphon structures and the CIPP lining of the pipes in-between the structures on interceptor 1-MN-310.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →