Retrieving RFP details
Release
Close
City of Branson
Provide for the removal, inspection, installation, and lowering of one groundwater well pump assembly from City Well #12, including the submersible pump and motor, power cable, piping, air tubing, collars, check valves, bands, and all related pump assembly components.
City of Branson
Provide for the removal and installation of one groundwater well pump assembly from City Well #3, including the submersible pump and motor, power cable, piping, air tubing, collars, check valves, bands, and all related pump assembly components.
City of Missoula
Work includes replace the existing 100 hp vertical turbine lineshaft pump with a new 100 hp vertical turbine lineshaft pump, motor, and appurtenances; installation of a 100 hp pump and motor at a depth of 96' to bottom of tail pipe, including 10' tail pipe, 8" column pipe, 416 stainless steel shaft assembly, discharge head, and related components. The existing well casing is 12" in dia, the existing pump will be pulled and the well will be mechanically and chemically cleaned and televised by a separate contractor prior to the start of this project.
Town of Texhoma
Replacement of water well pipe and pump. The pipe should be 3" sch 80 pipe and a total of 399'. The pump needs to be a 20 HP pump with motor and shroud that will pump at a rate of 150-175 GPM. We would like to send a camera down hole to look at the well casing and at the perforations. The well currently is 433' total depth and static water level is 271'.
Release
Oct 23, 2025
Close
Nov 24, 2025