Posted
-
Dec 9, 2026
Woodside East Phase B RFP
Work includes woodside east phase b.
Description: Project consists of furnishing, installing, and providing all labor and materials associated with the drainage, paving, wastewater and water systems infrastructure improvements including: erosion controls, earthwork, 8" and 12" water main, 8" wastewater main, concrete curbs, asphalt paving, intersection ramps, and miscellaneous items associated
SpecialDistrict · TX, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
Posted
-
Dec 9, 2026
Work includes woodside east phase b.
Wildflower Municipal Utility Dist.
Special DistrictTX
Posted
Jul 23, 2024
Nov 13, 2026
Project scope shall include the Earthwork Improvements, approx. 65,286 CY of unclassified excavation.
CountyOK
Posted
Aug 12, 2026
Nov 20, 2026
Town square, phase 1.
CityKY
Posted
-
Nov 19, 2026
The project will consist of asphalt pavement trail installation, construction of three wooden boardwalks of varying lengths, construction of a concrete capped, 227-foot bridge with a lookout crossing a pond, construction of swales and storm systems, excavation, and reseeding. The City of Madisonville is soliciting bids for the redesigned third phase of trail expansion at Mahr Park. The project will consist of asphalt pavement trail installation, construction of three wooden boardwalks of varying lengths, construction of a concrete capped, 227-foot bridge with a lookout crossing a pond, construction of swales and storm systems, excavation, and reseeding.