Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide replacement of sanitary sewer mains includes 180 LF of 8" pvc gravity sewer -mh 169 to mh 170; 72 LF of 8" pvc gravity sewer - mh 170 to co 1; 78 LF of 8" pvc gravity sewer -co 1 to co 2 ; 605 LF of select trench backfill; 190 sy of pavement restoration; cut and cap line from co to mh 168.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request for bids for the installation of water main, replacement of water services and curb valves, and removal and replacement of sewer main, manholes, and sewer services.
Posted Date
Jan 24, 2026
Due Date
Feb 17, 2026
Release: Jan 24, 2026
Close: Feb 17, 2026
Request for bids for the installation of water main, replacement of water services and curb valves, and removal and replacement of sewer main, manholes, and sewer services.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking proposals for the Plymouth Estates Water Main project.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Seeking proposals for the Plymouth Estates Water Main project.
AvailableThis project consists of open channel clearing, open channel cleanout, drain crossings and storm sewer construction, driveway and road restoration. Said drain is approx 5.89 miles in length, 3' in width, and 4' in depth, and is an existing open channel and enclosed drain.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
This project consists of open channel clearing, open channel cleanout, drain crossings and storm sewer construction, driveway and road restoration. Said drain is approx 5.89 miles in length, 3' in width, and 4' in depth, and is an existing open channel and enclosed drain.
AvailableThe project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
Posted Date
Jan 13, 2026
Due Date
Jan 30, 2026
Release: Jan 13, 2026
Close: Jan 30, 2026
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →