CityNY
Posted
Aug 24, 2026
Sep 17, 2026
Harding Avenue Pump Station Emergency Replacement
Replacement of two (2) existing centrifugal pumps, electrical wiring associated with disconnection of existing pumps and reconnection of cornell 4nntl-vc5 solids handling centrifugal pumps to existing electrical conduit and existing pump control panel in pump house, replacement of existing pump intake with new suction pipe and associated valves and fittings, reconnection of pumps to existing discharge line.