Aug 10, 2026
Closes
Aug 31, 2026
Building 36000 2nd Floor Reconfiguration to Conference Space RFP
This project is to Reconfigure Building 36000 2nd Floor Conference Space. This consists of the reconfiguration of the 2nd Floor area to better serve as a conference room suite. This includes demolition and construction of walls, doors, electrical power and lighting, mechanical ductwork, plumbing fixtures and lines, and adjustment of fire suppression, alarm, and mass notification systems.