Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Department of Agriculture (White Mountain National Forest) requests contractor services to upgrade the electrical distribution system at the Saco Ranger District administration site and replace damaged transformers at WMF Headquarters. The contractor must furnish labor, materials, equipment, supervision, and transportation, comply with applicable FAR clauses, and complete work within 90 days of Notice to Proceed. Award will be based on the lowest price, and bidders should consult the official SAM posting for full response instructions and attachments.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes but is not limited to, at the Saco location: Upgrade (1) 400 ampere circuit breaker/current transformer cabinet. Upgrade (1) 400 ampere electrical panel with breakers. Upgrade (1) 24-circuit load center with breakers. Grounding shall conform to National Fire Protection Association (NFPA) National Electric Code (NEC) 2023. Include all wire and materials to complete project in accordance with NFPA NEC 2023. Removal of all components that were upgraded and all waste generated. See attached file.
Posted Date
Jan 20, 2026
Due Date
Feb 20, 2026
Release: Jan 20, 2026
Close: Feb 20, 2026
Work includes but is not limited to, at the Saco location: Upgrade (1) 400 ampere circuit breaker/current transformer cabinet. Upgrade (1) 400 ampere electrical panel with breakers. Upgrade (1) 24-circuit load center with breakers. Grounding shall conform to National Fire Protection Association (NFPA) National Electric Code (NEC) 2023. Include all wire and materials to complete project in accordance with NFPA NEC 2023. Removal of all components that were upgraded and all waste generated. See attached file.
AvailableThe USDA Forest Service issued Solicitation 12445526Q0005 for replacement/upgrades of electrical panels and a transformer at the White Mountain National Forest (Saco Ranger District in Conway, NH and WMNF Headquarters in Campton, NH). The work includes upgrading a 400A breaker/current transformer cabinet, a 400A electrical panel, a 24-circuit load center, replacing a damaged transformer, bringing grounding and wiring to NFPA NEC 2023 standards, and disposal of removed equipment; performance is required within 90 days after NTP with work estimated to begin around 2025-10-01. This is a Total Small Business set-aside (NAICS 238210) with attachments including a Statement of Work, Schedule of Items, and Wage Determination.
Posted Date
Jan 20, 2026
Due Date
Feb 20, 2026
Release: Jan 20, 2026
Close: Feb 20, 2026
Provide panel, electrical-el, NSN 5975016037436, Qty 32 UI Ea
Posted Date
Jan 22, 2026
Due Date
Jan 30, 2026
Release: Jan 22, 2026
Close: Jan 30, 2026
Provide panel, electrical-el, NSN 5975016037436, Qty 32 UI Ea
AvailableThis RFP is for electrical service panel replacements for Lewis and Clark Halls.
Posted Date
Jan 6, 2026
Due Date
Feb 12, 2026
Release: Jan 6, 2026
Close: Feb 12, 2026
This RFP is for electrical service panel replacements for Lewis and Clark Halls.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →The USDA Forest Service issued Solicitation 12445526Q0005 for replacement/upgrades of electrical panels and a transformer at the White Mountain National Forest (Saco Ranger District in Conway, NH and WMNF Headquarters in Campton, NH). The work includes upgrading a 400A breaker/current transformer cabinet, a 400A electrical panel, a 24-circuit load center, replacing a damaged transformer, bringing grounding and wiring to NFPA NEC 2023 standards, and disposal of removed equipment; performance is required within 90 days after NTP with work estimated to begin around 2025-10-01. This is a Total Small Business set-aside (NAICS 238210) with attachments including a Statement of Work, Schedule of Items, and Wage Determination.