Los Angeles County Waterworks Districts
Special DistrictCA
Posted
Sep 1, 2026
Sep 29, 2026
Rosewood 139th Street, Et Al. Phase Ii
Work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (ccpr); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (cspb); and place a layer of rubberized hot-mix asphalt over the ccpr on cspb to provide a long lasting finished driving surface.