Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes limestone stone block bench 4 EA; limestone retaining wall 50 ton; dewatering 1 ls; clearing and grubbing 1 LS; topsoil, on-site 338 CY; excavation, class 10 585 CY; storm sewer, trenched, RCP, 30" 20 LF; storm sewer, trenched, RACP, 51x31" 16 LF; removal of storm sewer, RCP 32 LF; pipe apron, RCP, 30" 1 EA; pipe apron, RCAP, 51X31" 1 EA; footing for concrete pipe apron, RCP, 30" 1 EA; footing for concrete pipe apron, RCAP, 51X31" 1 EA; pipe apron guard, 30" 1 EA; pipe apron guard, 51x31" 1 EA; removal of shared use path 75 SY; shared use path, PCC, 6" 75 SY; sidewalk, PCC, 5" 260 SY; temporary traffic control 1 LS; traffic signs 2 EA. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The 74th street improvements project includes pavement reconstruction, storm sewer installation and water main replacement.
Posted Date
Jan 9, 2026
Due Date
Feb 10, 2026
Release: Jan 9, 2026
Close: Feb 10, 2026
The 74th street improvements project includes pavement reconstruction, storm sewer installation and water main replacement.
AvailableProject is a tenant finish out of an existing space inside inside the broadway plaza.
Posted Date
-
Due Date
Feb 4, 2026
Release: -
Close: Feb 4, 2026
Project is a tenant finish out of an existing space inside inside the broadway plaza.
AvailableProvide 2 roofed barnyards, access roads, trails and walkways, fence and a water well.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Provide 2 roofed barnyards, access roads, trails and walkways, fence and a water well.
AvailableConstruction of improvements to an existing stormwater control measure and drainage channel, including a constructed wetland, biofiltration system, channel lining removal, and associated site improvements.
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
Construction of improvements to an existing stormwater control measure and drainage channel, including a constructed wetland, biofiltration system, channel lining removal, and associated site improvements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis