Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of installation of storm sewer including storm sewer abandonment and removal, pipe and intake installation, PPC pavement, and sodding. Work includes topsoil, on-site 18 CY; storm sewer, trenched, 24" 73 LF; removal of storm sewer, RCP, 15" 47 LF; storm sewer abandonment, fill and plug, 15" 425 LF; subdrain pop up outlet 2 EA; intake, nyloplast 30" 2 EA; manhole adjustment, minor 1 EA; connection to existing manhole 1 EA; remove intake 2 EA; removal of sidewalk 20 SY; removal of driveway 40 SY; sidewalk, PCC 4" 20 SY; sidewalk, PCC, 6" 7 SY; detectable warning 10 SF; driveway, paved, PCC, 6" 40 SY; full depth patches, PCC, 9" 170 SY; temporary traffic control 1 LS. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The 74th street improvements project includes pavement reconstruction, storm sewer installation and water main replacement.
Posted Date
Jan 9, 2026
Due Date
Feb 10, 2026
Release: Jan 9, 2026
Close: Feb 10, 2026
The 74th street improvements project includes pavement reconstruction, storm sewer installation and water main replacement.
AvailableRelease: Jan 20, 2026
Close: Feb 9, 2026
Storm sewer improvements.
AvailableWork consists of: Removing and disposing of the top 2' of a 4' X 6' box culvert, and pulverizing the bottom. Installing a 24" diameter C-900 storm sewer. Excavating, handling, transporting, and disposing of soils contaminated with TCE, SVOCs, and arsenic. Restoring pavement with new base and HMA pavement.
Posted Date
Jan 2, 2026
Due Date
Feb 5, 2026
Release: Jan 2, 2026
Close: Feb 5, 2026
Work consists of: Removing and disposing of the top 2' of a 4' X 6' box culvert, and pulverizing the bottom. Installing a 24" diameter C-900 storm sewer. Excavating, handling, transporting, and disposing of soils contaminated with TCE, SVOCs, and arsenic. Restoring pavement with new base and HMA pavement.
AvailableThis project involves sanitary and storm sewer point repairs including but not limited to: sanitary and storm sewer excavation point repairs; replacement of wye and lateral pipe; mh installation; location and adjustment of buried sanitary and storm sewer manholes; invert replacement; cctv verification of the repair locations; and the post repair nassco CCTV.
Posted Date
Jan 15, 2026
Due Date
Feb 4, 2026
Release: Jan 15, 2026
Close: Feb 4, 2026
This project involves sanitary and storm sewer point repairs including but not limited to: sanitary and storm sewer excavation point repairs; replacement of wye and lateral pipe; mh installation; location and adjustment of buried sanitary and storm sewer manholes; invert replacement; cctv verification of the repair locations; and the post repair nassco CCTV.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis