Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of window replacement services for Eisenhower, Horace Mann, and Wilson Elementary Schools.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Marysville Public Schools is soliciting proposals to replace windows at Gardens Elementary, Morton Elementary, and Washington Elementary as part of its 2025 Bond Issue; bidders must follow the project bidding documents prepared by French Associates and comply with Michigan prevailing wage requirements. Bids are to be submitted electronically through BuildingConnected and require sworn/notarized affidavits (e.g., Familial Disclosure, Iran Linked Business, Criminal Background Check). The solicitation was posted Jan 13, 2026 and is open with a bid deadline of Feb 3, 2026.
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Close: Feb 3, 2026
Marysville Public Schools is soliciting proposals to replace windows at Gardens Elementary, Morton Elementary, and Washington Elementary as part of its 2025 Bond Issue; bidders must follow the project bidding documents prepared by French Associates and comply with Michigan prevailing wage requirements. Bids are to be submitted electronically through BuildingConnected and require sworn/notarized affidavits (e.g., Familial Disclosure, Iran Linked Business, Criminal Background Check). The solicitation was posted Jan 13, 2026 and is open with a bid deadline of Feb 3, 2026.
AvailableElementary school window removal and replacement.
Posted Date
Jan 5, 2026
Due Date
Jan 30, 2026
Release: Jan 5, 2026
Close: Jan 30, 2026
Elementary school window removal and replacement.
AvailableNorfolk City Public Schools is soliciting sealed bids for window removal and replacement at Larrymore Elementary School (7600 Halprin Drive, Norfolk, VA). The scope includes removal of damaged glass and hazardous materials, replacement of windowpanes and stainless steel trim caps, delivery/coordination of a lift, debris removal, and leak/pressure testing; the contract period is expected to complete by August 24, 2026. Bids are due February 9, 2026 at 2:00 PM local time, and bidders must meet minimum experience and insurance requirements.
Posted Date
Jan 12, 2026
Due Date
Feb 9, 2026
Release: Jan 12, 2026
Close: Feb 9, 2026
Norfolk City Public Schools is soliciting sealed bids for window removal and replacement at Larrymore Elementary School (7600 Halprin Drive, Norfolk, VA). The scope includes removal of damaged glass and hazardous materials, replacement of windowpanes and stainless steel trim caps, delivery/coordination of a lift, debris removal, and leak/pressure testing; the contract period is expected to complete by August 24, 2026. Bids are due February 9, 2026 at 2:00 PM local time, and bidders must meet minimum experience and insurance requirements.
AvailableThe Somerset Berkley Regional School District is soliciting bids for Phase 2 of the Chace Street Window Replacement Project at Chace Elementary School, which includes removing existing windows and installing new aluminum frame factory-glazed units plus associated masonry, carpentry, and painting work. The project has an estimated value of $1,095,000 and bidders must meet contractor qualifications and provide bid security (5% minimum). A pre-bid conference is scheduled for January 12, 2026 at 3:40 PM at 538 Chace St, Somerset, MA, and the response deadline is January 29, 2026.
Posted Date
Jan 7, 2026
Due Date
Jan 29, 2026
Release: Jan 7, 2026
Close: Jan 29, 2026
The Somerset Berkley Regional School District is soliciting bids for Phase 2 of the Chace Street Window Replacement Project at Chace Elementary School, which includes removing existing windows and installing new aluminum frame factory-glazed units plus associated masonry, carpentry, and painting work. The project has an estimated value of $1,095,000 and bidders must meet contractor qualifications and provide bid security (5% minimum). A pre-bid conference is scheduled for January 12, 2026 at 3:40 PM at 538 Chace St, Somerset, MA, and the response deadline is January 29, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis