Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking proposals for a professional consultant to conduct a public window preservation and restoration workshop.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Greenville seeks a professional consultant to conduct a public window preservation and restoration workshop.
Posted Date
Jan 20, 2026
Due Date
Feb 10, 2026
Release: Jan 20, 2026
Close: Feb 10, 2026
The City of Greenville seeks a professional consultant to conduct a public window preservation and restoration workshop.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of Courthouse Restoration: Tuck point, window sealing & cleaning the exterior. The selected vendor will be responsible for the following: Clean and seal exterior surface, inspect mortar cracks and openings greater than 1/32”. Those eroded more than 1/4” in depth shall be cleaned of all loose debris. Defective mortar joints will be pointed with non-staining, non-shrinking type N masonry pointing mortar. R&R existing window & door sealants on competition surface shall be given application of natural stone treatment. Clean outside of windows & seal them.
Posted Date
Dec 17, 2025
Due Date
Jan 27, 2026
Release: Dec 17, 2025
Close: Jan 27, 2026
Work consists of Courthouse Restoration: Tuck point, window sealing & cleaning the exterior. The selected vendor will be responsible for the following: Clean and seal exterior surface, inspect mortar cracks and openings greater than 1/32”. Those eroded more than 1/4” in depth shall be cleaned of all loose debris. Defective mortar joints will be pointed with non-staining, non-shrinking type N masonry pointing mortar. R&R existing window & door sealants on competition surface shall be given application of natural stone treatment. Clean outside of windows & seal them.
AvailableRelease: Oct 22, 2025
Close: Feb 13, 2026
Memorial hall historic window restoration.
AvailableWork includes re-alignment of 250-LF of stream channel re-alignment, including filling in of the old channel alignment and floodplain grading; restoring 500-LF of stream channel in place, including floodplain grading; re-alignment of 60-LF of tributary channel, including filling in of the old channel; installation of in-stream grade control features that include boulder vanes, log vanes, boulder riffles, drop structures and boulder sills; stabilization of channel embankment through the use of longitudinal fill stone toe protection and geolifts; seeding and planting.
Posted Date
Jul 25, 2025
Due Date
Jan 27, 2026
Release: Jul 25, 2025
Close: Jan 27, 2026
Work includes re-alignment of 250-LF of stream channel re-alignment, including filling in of the old channel alignment and floodplain grading; restoring 500-LF of stream channel in place, including floodplain grading; re-alignment of 60-LF of tributary channel, including filling in of the old channel; installation of in-stream grade control features that include boulder vanes, log vanes, boulder riffles, drop structures and boulder sills; stabilization of channel embankment through the use of longitudinal fill stone toe protection and geolifts; seeding and planting.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →