CityMO
Aug 29, 2026
Closes
Sep 22, 2026
WILLOW BRANCH CULVERT REPLACEMENT WALL AVE., 6th TO 7th
City of Joplin is soliciting construction bids for the Wall Avenue segment from 6th Street to 7th Street of the Willow Branch stormwater project. The scope includes 441 LF of 12’x4’ reinforced concrete box storm sewer, 53 LF of 18” reinforced concrete pipe, inlets, a junction box, paving, curb and gutter, sidewalks, an ADA ramp, driveway construction, brick pavers, Silva Cell, and miscellaneous completion work. The official page classifies it under Public Works and states that the work must be completed before the MoDOT 7th Street storm sewer at Wall and 7th Street; it lists a mandatory pre-bid meeting on 9/10/26 at 10AM and bid closing on 9/22/2026 at 2:00 PM.