Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of all materials, labor, and equipment for the complete installation of sedimentation basin solids collection equipment, concrete rehabilitation, filter improvements, hydraulic modifications, backwash pump replacement, air scour blower replacement, caustic feed re-location, and pipe improvements in the settled solids and backwash equalization tanks at the Williams Water Treatment Plant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Project generally consists of the following Construction Contract: Contract No. 1 Marshall MU WTP Residuals Improvements. Replacement of the sludge press control panels and replacement of the residuals building air compressor and air dryer.
Posted Date
Jan 20, 2026
Due Date
Feb 17, 2026
Release: Jan 20, 2026
Close: Feb 17, 2026
The Project generally consists of the following Construction Contract: Contract No. 1 Marshall MU WTP Residuals Improvements. Replacement of the sludge press control panels and replacement of the residuals building air compressor and air dryer.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Detention Basin including outfall stabilization, installation of vegetation and all other associated work.
Posted Date
Jan 20, 2026
Due Date
Feb 19, 2026
Release: Jan 20, 2026
Close: Feb 19, 2026
Detention Basin including outfall stabilization, installation of vegetation and all other associated work.
AvailableSchertz-Seguin Local Government Corporation is soliciting sealed bids for improvements to the Gonzales Water Treatment Plant chlorine storage room. The work includes new concrete pads, gas detection, room heaters, FRP doors, replacement of a chlorine pipe manifold, 1‑ton scales and indicators, decommissioning of the chlorine dioxide system, SCADA integration, and associated electrical work. Bids must be submitted electronically via the City of Seguin’s BidNetDirect portal by the stated closing date and time.
Posted Date
-
Due Date
Mar 3, 2026
Close: Mar 3, 2026
Schertz-Seguin Local Government Corporation is soliciting sealed bids for improvements to the Gonzales Water Treatment Plant chlorine storage room. The work includes new concrete pads, gas detection, room heaters, FRP doors, replacement of a chlorine pipe manifold, 1‑ton scales and indicators, decommissioning of the chlorine dioxide system, SCADA integration, and associated electrical work. Bids must be submitted electronically via the City of Seguin’s BidNetDirect portal by the stated closing date and time.
Installation of new Liquid Lime and Liquid Zinc Orthophosphate feed systems and decommissioning and removal of the existing hydrated lime system. The scope includes construction of a new lime storage/ feed building, electrical/controls and valving and piping related work.
Posted Date
Jan 10, 2026
Due Date
Feb 3, 2026
Release: Jan 10, 2026
Close: Feb 3, 2026
Installation of new Liquid Lime and Liquid Zinc Orthophosphate feed systems and decommissioning and removal of the existing hydrated lime system. The scope includes construction of a new lime storage/ feed building, electrical/controls and valving and piping related work.
Available