Summary
Work includes 500 LF furnish and install reinforced filter fabric fence behind all back of curb as per the plans; 1 LS provide final grading of park site, to include top soil stripping, excavation, on-site hauling, placement; 4,300 SF furnish and install 4-inch (4") thick concrete sidewalk as per the plans; 3 ea furnish and install ada ramp as per the plan; 30,851 SF furnish and install bermuda grass seed within park as per the plans; 4 EA furnish and install live oak, 45 gal., 2.5" cal. Within park as per the plans; 190 CY furnish and install 2" top soil for turf areas within park as per the plans. See attached file.