Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Ellison Development, LLC
Work includes 500 LF furnish and install reinforced filter fabric fence behind all back of curb as per the plans; 1 LS provide final grading of park site, to include top soil stripping, excavation, on-site hauling, placement; 4,300 SF furnish and install 4-inch (4") thick concrete sidewalk as per the plans; 3 ea furnish and install ada ramp as per the plan; 30,851 SF furnish and install bermuda grass seed within park as per the plans; 4 EA furnish and install live oak, 45 gal., 2.5" cal. Within park as per the plans; 190 CY furnish and install 2" top soil for turf areas within park as per the plans. See attached file.
Posted Date
May 19, 2026
Due Date
Jun 2, 2026
Release: May 19, 2026
Ellison Development, LLC
Close: Jun 2, 2026
Work includes 500 LF furnish and install reinforced filter fabric fence behind all back of curb as per the plans; 1 LS provide final grading of park site, to include top soil stripping, excavation, on-site hauling, placement; 4,300 SF furnish and install 4-inch (4") thick concrete sidewalk as per the plans; 3 ea furnish and install ada ramp as per the plan; 30,851 SF furnish and install bermuda grass seed within park as per the plans; 4 EA furnish and install live oak, 45 gal., 2.5" cal. Within park as per the plans; 190 CY furnish and install 2" top soil for turf areas within park as per the plans. See attached file.
AvailableEllison Development, LLC
Work consists of all necessary items to complete all clearing necessary for section 1 storm drainage
Posted Date
Nov 21, 2025
Due Date
Jan 7, 2026
Release: Nov 21, 2025
Ellison Development, LLC
Close: Jan 7, 2026
Work consists of all necessary items to complete all clearing necessary for section 1 storm drainage
Ellison Development, LLC
Water, sewer, drainage and paving facilities to serve a residential subdivision. Approx. 4,125 LF Furnish and Install 8" PVC C900 Waterline, including all valves and fittings; Furnish and Install 8" Gate Valve and Box; Furnish and Install Fire Hydrant Assembly, including 6" Gate Valve and Box and 6" Tee; 1,810 LF Furnish and Install 8" PVC SDR 26 Sanitary Sewer, bury depth approximately four to eight feet (4'-8')
Posted Date
Nov 14, 2025
Due Date
Nov 20, 2025
Release: Nov 14, 2025
Ellison Development, LLC
Close: Nov 20, 2025
Water, sewer, drainage and paving facilities to serve a residential subdivision. Approx. 4,125 LF Furnish and Install 8" PVC C900 Waterline, including all valves and fittings; Furnish and Install 8" Gate Valve and Box; Furnish and Install Fire Hydrant Assembly, including 6" Gate Valve and Box and 6" Tee; 1,810 LF Furnish and Install 8" PVC SDR 26 Sanitary Sewer, bury depth approximately four to eight feet (4'-8')
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge