Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of approx. 330 LF Salvage Outlet Structures; 20 LF Saw Cut Bituminous; 21000 CY Common Excavation; 2260 LF Erosion Control Log; 3000 SY Erosion Control Blanket; see outside link for more details.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Approx. 68 CY Earth excavation; 0.100 AC seeding, class 7; 7.500 P nitrogen fertilizer nutrient; 459 SY erosion control blanket; 265 ft perimeter erosion barrier; 71 SY Portland cement concrete pavement 9"; 1 SF box culvert end sections, culvert no. 1; 120 ft precast concrete box culverts 8' x 3'; 1 EA manholes, type A, 4 LF-diameter, type 1 frame, closed lid; 28 CAL DA changeable message sign. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Approx. 68 CY Earth excavation; 0.100 AC seeding, class 7; 7.500 P nitrogen fertilizer nutrient; 459 SY erosion control blanket; 265 ft perimeter erosion barrier; 71 SY Portland cement concrete pavement 9"; 1 SF box culvert end sections, culvert no. 1; 120 ft precast concrete box culverts 8' x 3'; 1 EA manholes, type A, 4 LF-diameter, type 1 frame, closed lid; 28 CAL DA changeable message sign. See outside link.
Premium
Access the largest public sector contact database
Replace the existing deteriorating metal pipe culvert with a reinforced concrete box culvert.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Replace the existing deteriorating metal pipe culvert with a reinforced concrete box culvert.
AvailableProject work consists of culvert replacements and repairs at various locations.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
Project work consists of culvert replacements and repairs at various locations.
AvailableThe grading of a ditch, culvert installation, and other related incidental work. The project is referred to as City South” and includes all labor, materials, transportation, and equipment required for approx. 0.4 miles of channel grading and stabilization, culvert installation, and related incidental work.
Posted Date
Nov 26, 2025
Due Date
Dec 15, 2025
Release: Nov 26, 2025
Close: Dec 15, 2025
The grading of a ditch, culvert installation, and other related incidental work. The project is referred to as City South” and includes all labor, materials, transportation, and equipment required for approx. 0.4 miles of channel grading and stabilization, culvert installation, and related incidental work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis