Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The grading of a ditch, culvert installation, and other related incidental work. The project is referred to as City South” and includes all labor, materials, transportation, and equipment required for approx. 0.4 miles of channel grading and stabilization, culvert installation, and related incidental work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
This solicitation requests bidders to perform emergency bank stabilization along San Francisquito Creek, including mobilization, access and staging development, temporary control measures, northbank stabilization (approximately 130 linear feet using boulder revetment and wrapped soil lifts), southern embankment repairs, and replacement of the Menlo Park storm drain outfall. The work also includes irrigation, revegetation, and 365-day landscape maintenance following substantial completion.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
Close: Jan 8, 2026
This solicitation requests bidders to perform emergency bank stabilization along San Francisquito Creek, including mobilization, access and staging development, temporary control measures, northbank stabilization (approximately 130 linear feet using boulder revetment and wrapped soil lifts), southern embankment repairs, and replacement of the Menlo Park storm drain outfall. The work also includes irrigation, revegetation, and 365-day landscape maintenance following substantial completion.
AvailableGolf stream stabilization and associated items of work.
Posted Date
Nov 24, 2025
Due Date
Dec 19, 2025
Release: Nov 24, 2025
Close: Dec 19, 2025
Golf stream stabilization and associated items of work.
AvailableCity of Morganton seeks engineering design and construction administration/management services to rebuild and stabilize ~700 linear feet of washed-out greenway/stream bank at Rocky Ford. Scope includes topographic/survey, detailed plans and specifications, bid documents, bidding/contract administration, construction oversight, acquisition of local/state/federal permits, and two cost estimates (repair-to-existing and resiliency) for FEMA submittal. Requires FEMA experience; project to be delivered as Design-Bid.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Close: Jan 8, 2026
City of Morganton seeks engineering design and construction administration/management services to rebuild and stabilize ~700 linear feet of washed-out greenway/stream bank at Rocky Ford. Scope includes topographic/survey, detailed plans and specifications, bid documents, bidding/contract administration, construction oversight, acquisition of local/state/federal permits, and two cost estimates (repair-to-existing and resiliency) for FEMA submittal. Requires FEMA experience; project to be delivered as Design-Bid.
AvailableThe project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
Posted Date
Nov 18, 2025
Due Date
Jan 20, 2026
Release: Nov 18, 2025
Close: Jan 20, 2026
The project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis