Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
City of Morganton seeks engineering design and construction administration/management services to rebuild and stabilize ~700 linear feet of washed-out greenway/stream bank at Rocky Ford. Scope includes topographic/survey, detailed plans and specifications, bid documents, bidding/contract administration, construction oversight, acquisition of local/state/federal permits, and two cost estimates (repair-to-existing and resiliency) for FEMA submittal. Requires FEMA experience; project to be delivered as Design-Bid.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Providing engineering services that include full set of designs, and construction project certification upon completion, for the stabilization and restoration of eight site areas. Scope of work will include site evaluations, stabilization solutions in the form of bid ready construction documents, and preliminary cost estimates for future work.
Posted Date
Nov 26, 2025
Due Date
Jan 6, 2026
Release: Nov 26, 2025
Close: Jan 6, 2026
Providing engineering services that include full set of designs, and construction project certification upon completion, for the stabilization and restoration of eight site areas. Scope of work will include site evaluations, stabilization solutions in the form of bid ready construction documents, and preliminary cost estimates for future work.
AvailableHenry County seeks qualified firms to provide engineering design services for the Camp Creek Greenway Trail (GDOT P.I. No. 0021215). Statements of Qualifications are due via the County’s eProcurement Portal by 3:00 PM ET on December 17, 2025.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Close: Dec 17, 2025
Henry County seeks qualified firms to provide engineering design services for the Camp Creek Greenway Trail (GDOT P.I. No. 0021215). Statements of Qualifications are due via the County’s eProcurement Portal by 3:00 PM ET on December 17, 2025.
AvailableTown of Carrboro solicits CEI and construction contract administration services for Morgan Creek Greenway Phase 1 (approx. 1,723 linear feet pedestrian greenway, two pedestrian bridges ~100' and ~55', retaining walls and stream buffers). Requires NCDOT prequalification for Work Codes 233 and 195, NC-registered Professional Engineers for responsible charge, $1,000,000 professional liability insurance, 2-year cost-plus contract; submit a Letter of Interest (LOI) with completed RS-2 forms, 15-page LOI limit.
Posted Date
Dec 7, 2025
Due Date
Jan 2, 2026
Release: Dec 7, 2025
Close: Jan 2, 2026
Town of Carrboro solicits CEI and construction contract administration services for Morgan Creek Greenway Phase 1 (approx. 1,723 linear feet pedestrian greenway, two pedestrian bridges ~100' and ~55', retaining walls and stream buffers). Requires NCDOT prequalification for Work Codes 233 and 195, NC-registered Professional Engineers for responsible charge, $1,000,000 professional liability insurance, 2-year cost-plus contract; submit a Letter of Interest (LOI) with completed RS-2 forms, 15-page LOI limit.
This solicitation requests bidders to perform emergency bank stabilization along San Francisquito Creek, including mobilization, access and staging development, temporary control measures, northbank stabilization (approximately 130 linear feet using boulder revetment and wrapped soil lifts), southern embankment repairs, and replacement of the Menlo Park storm drain outfall. The work also includes irrigation, revegetation, and 365-day landscape maintenance following substantial completion.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
Close: Jan 8, 2026
This solicitation requests bidders to perform emergency bank stabilization along San Francisquito Creek, including mobilization, access and staging development, temporary control measures, northbank stabilization (approximately 130 linear feet using boulder revetment and wrapped soil lifts), southern embankment repairs, and replacement of the Menlo Park storm drain outfall. The work also includes irrigation, revegetation, and 365-day landscape maintenance following substantial completion.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis