Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Isolating the intake tower structure of dam to perform repairs and inspection assessments of the infrastructure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Colville is soliciting sealed bids for construction of an approximately one‑million‑gallon, cast‑in‑place water reservoir with associated site improvements. Work includes site piping and valves, grading, a MIOX system and building, electrical connections, valve vault improvements including a pressure reducing valve and altitude valve, and site restoration.
Posted Date
Nov 17, 2025
Due Date
Jan 5, 2026
Release: Nov 17, 2025
Close: Jan 5, 2026
The City of Colville is soliciting sealed bids for construction of an approximately one‑million‑gallon, cast‑in‑place water reservoir with associated site improvements. Work includes site piping and valves, grading, a MIOX system and building, electrical connections, valve vault improvements including a pressure reducing valve and altitude valve, and site restoration.
Premium
Access the largest public sector contact database
The City of Colville is soliciting sealed bids for construction of an approximately one‑million‑gallon, cast‑in‑place water reservoir with associated site improvements. Work includes site piping and valves, grading, a MIOX system and building, electrical connections, valve vault improvements including a pressure reducing valve and altitude valve, and site restoration.
Posted Date
Nov 17, 2025
Due Date
Jan 5, 2026
Release: Nov 17, 2025
Close: Jan 5, 2026
The City of Colville is soliciting sealed bids for construction of an approximately one‑million‑gallon, cast‑in‑place water reservoir with associated site improvements. Work includes site piping and valves, grading, a MIOX system and building, electrical connections, valve vault improvements including a pressure reducing valve and altitude valve, and site restoration.
AvailableWork includes reservoir dams improvement.
Posted Date
Dec 4, 2025
Due Date
Jan 20, 2026
Release: Dec 4, 2025
Close: Jan 20, 2026
Work includes reservoir dams improvement.
AvailableConstruction of a new chlorine contact basin, and structural upgrades of the existing finished water reservoir. Construction requires the removal of solids recovery basin (srb) #3 and relocation of piping and electrical for the solids recovery pump station. The remaining work consists of a new ramp into the concrete-lined basin, a roadway along the west and south side of the srbs, replacement of HVAC equipment, and new generators at the operations annex and south coast booster pump station. Work also includes installation of piping and other appurtenances to complete the work, and the repair and reconstruction of existing improvements affected by the work, and incidentals for complete and usable facility.
Posted Date
Nov 6, 2025
Due Date
Jan 22, 2026
Release: Nov 6, 2025
Close: Jan 22, 2026
Construction of a new chlorine contact basin, and structural upgrades of the existing finished water reservoir. Construction requires the removal of solids recovery basin (srb) #3 and relocation of piping and electrical for the solids recovery pump station. The remaining work consists of a new ramp into the concrete-lined basin, a roadway along the west and south side of the srbs, replacement of HVAC equipment, and new generators at the operations annex and south coast booster pump station. Work also includes installation of piping and other appurtenances to complete the work, and the repair and reconstruction of existing improvements affected by the work, and incidentals for complete and usable facility.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis