Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 37 CY abandoning sewer; 25,305 CY excavation common; 1,230 TN base aggregate dense 3"; 21,120 SY concrete pavement 8"; 80 GAL tack coat; 250 TN HMA pavement 3 mt 58-28 s; 90 SF concrete surface repair; 14,285 LF concrete curb & gutter, 31"; 4,480 SF concrete sidewalk 7"; 150 SF curb ramp detectable warning field natural patina; 650 SY concrete driveway 7"; 40 LF storm sewer pipe reinforced concrete class iii 15"; 20 EA reconstructing manholes; 1 EA manholes 4-LF diameter; 8 EA adjusting manhole covers; 88 LF pipe underdrain unperforated 6"; 21,320 SY topsoil; 199. 50 SF signs type ii reflective f; 4,620 LF marking line epoxy 6".
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of approx. the reconstruction of CTH V from IH 43 to CTH R. Project includes grading, curb and gutter, HMA pavement, pavement marking, base aggregate, and all other items necessary to construct the project.
Posted Date
Jan 26, 2026
Due Date
Mar 2, 2026
Release: Jan 26, 2026
Close: Mar 2, 2026
Work consists of approx. the reconstruction of CTH V from IH 43 to CTH R. Project includes grading, curb and gutter, HMA pavement, pavement marking, base aggregate, and all other items necessary to construct the project.
AvailableApproximate quantities are as follows: Excavation Common 23,615 CY; Excavation Marsh 1,280 CY; Base Aggregate Dense 40,490 Ton; Breaker Run 13,155 Ton; Pulverize and Relay 14,420 SY; HMA Pavement 11,870 Ton; Culvert Pipes 1,790 LF; Storm Sewer 150 LF; Concrete Curb & Gutter 2,790 LF; Salvaged Topsoil 43,700 SY; Pavement Markings 38,210 LF. The project is expected to be awarded February 19, 2026. The project is expected to be substantially completed by September 11, 2026 and shall be fully completed by September 25, 2026. Construction time is of the essence.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
Approximate quantities are as follows: Excavation Common 23,615 CY; Excavation Marsh 1,280 CY; Base Aggregate Dense 40,490 Ton; Breaker Run 13,155 Ton; Pulverize and Relay 14,420 SY; HMA Pavement 11,870 Ton; Culvert Pipes 1,790 LF; Storm Sewer 150 LF; Concrete Curb & Gutter 2,790 LF; Salvaged Topsoil 43,700 SY; Pavement Markings 38,210 LF. The project is expected to be awarded February 19, 2026. The project is expected to be substantially completed by September 11, 2026 and shall be fully completed by September 25, 2026. Construction time is of the essence.
Work include 54 ea removing small pipe culverts; 100 SY removing concrete pavement; 617 SY removing asphaltic surface butt joints; 490 LF removing curb & gutter; 315 LF removing guardrail; 2,575 LF removing fence; 44,143 CY excavation common; 418 LF culvert pipe corrugated steel 15"; 1,191 LF culvert pipe corrugated steel 18"; 76 LF culvert pipe corrugated steel 30"; 72 LF culvert pipe corrugated steel 54"; 140 LF culvert pipe reinforced concrete class iv 18"; 104 LF culvert pipe reinforced concrete class iv 42".
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Work include 54 ea removing small pipe culverts; 100 SY removing concrete pavement; 617 SY removing asphaltic surface butt joints; 490 LF removing curb & gutter; 315 LF removing guardrail; 2,575 LF removing fence; 44,143 CY excavation common; 418 LF culvert pipe corrugated steel 15"; 1,191 LF culvert pipe corrugated steel 18"; 76 LF culvert pipe corrugated steel 30"; 72 LF culvert pipe corrugated steel 54"; 140 LF culvert pipe reinforced concrete class iv 18"; 104 LF culvert pipe reinforced concrete class iv 42".
Work includes 30,460 SY pulverize and relay; 1 EA finish grade base; 3,838 TN HMA pavement 3mt 58-28s binder; 2,985 TN HMA pavement 4mt 58-28s upper; 1,828 GAL tack coat.
Posted Date
Jan 28, 2026
Due Date
Feb 26, 2026
Release: Jan 28, 2026
Close: Feb 26, 2026
Work includes 30,460 SY pulverize and relay; 1 EA finish grade base; 3,838 TN HMA pavement 3mt 58-28s binder; 2,985 TN HMA pavement 4mt 58-28s upper; 1,828 GAL tack coat.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis