Higher EducationOK
Posted
Oct 28, 2026
Nov 18, 2026
Aviation Career Campus Boiler Replacement Project (Request for Proposal)
Qualified mechanical contractors for the complete replacement of the two (2) existing boiler system.
Description: Provide for a replacement of one of the existing boilers at the Westside Classroom Building.
HigherEducation · CT, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Western Connecticut State University.
These related opportunities are still open for bidding.
Higher EducationOK
Posted
Oct 28, 2026
Nov 18, 2026
Qualified mechanical contractors for the complete replacement of the two (2) existing boiler system.
CityTX
Posted
Oct 26, 2026
Nov 17, 2026
Work includes renovation and expansion of the existing public restroom facility at park in marble falls. The scope of work includes selective demolition of existing building components; removal and replacement of the existing roof structure; renovation of the existing men's and women's restrooms; construction of additional single-user, family-style restrooms; and associated structural, architectural, mechanical, electrical, plumbing, and site improvements. Improvements include new masonry construction, stone veneer, standing-seam metal roofing, covered walkways, restroom fixtures and partitions, interior and exterior finishes, lighting, ventilation, climate control for the new restrooms, accessibl
CityTX
Posted
Oct 9, 2026
Nov 18, 2026
Project includes approx. 68 LF of 8" PVC (PS-115, SDR-26, ASTM D3034) Sewer Pipe; 460 LF 15" PVC (PS-115, SDR-26, ASTM D3034) Sewer Pipe; 21,122 SY Hydromulch Seeding; 806 LF of Wire Fence; 3,124 4" Topsoil Import; 400 SY of 24" Grouted Rock Riprap (Aerial Crossing).
Special DistrictGA
Posted
Nov 10, 2026
Jan 12, 2027
Atlanta Beltline, Inc. (ABI) is soliciting competitive sealed bids from qualified firms to provide construction services for Westside Trail Segment 6 starting from the current end of Westside Trail at Lawton Street to the intersection with the Westside Trail adjacent to White St SW. The scope of work includes, but is not limited to, brownfield soil handling, erosion control, grading, demolition, site retaining/decorative walls, storm drainage, utilities, concrete trail paving, pavers, lighting, security cameras, signage and marking, fencing/railings, site furniture/waste receptacles, and bollards. Construction Drawings, Specifications, and other supplemental documents pertaining to this project are mentioned in the exhibits and/or appendices within this ITB and available for download from Bonfire https://Beltline.bonfirehub.com/portal/?tab=openOpportunities.