CityCA
Posted
Nov 6, 2026
Dec 3, 2026
Reservoir No. 2 Roof Replacement Project RFP
Replace the existing timber steel and timber framed roof structure. removal of the existing wood and membrane roof, steel superstructure, and precast concrete columns/footings; installation of new concrete sheer walls, concrete footings, and various concrete repairs; final design and installation of a complete aluminum roof system with ladders, walk pads, vents, hatches, and flashing; installation of new membrane liner; installation of solar-powered mixing equipment and control updates; reservoir cleaning and disinfection; testing, commissioning, and site restoration. The Project also includes minor concrete repairs to the exterior of Reservoir No. 1, located at the same site.
