Aug 13, 2026
Closes
Aug 27, 2026
2026 Public Safety Training Facility Parking Lot Replacement - Asphalt - (Request for Proposal)
The project requires sitework staking, demolition, and total removal of existing materials to facilitate the prepping of a sub-base ; installation of 4" of HMA over approx 25,000 SQFT of drive and parking lot area; application of parking lot re-striping, and the addition of a new 50 LF concrete walkway path adjacent to an existing building.