Summary
Work includes selective milling and demolition of areas of the main parking area, select removal of existing site features (fencing, signage, bollards, etc. ), removing and resetting of existing curbs, relocation of some light poles, new bituminous concrete pavement, new cement concrete sidewalks and curb ramps, new drainage infrastructure including a tree trench and bioretention basin, new striping and signage, new wood fencing, new interpretive signage, and new landscape soils and plantings. Work also includes the construction of a new concrete dumpster pad at the rear side of the middle school with protective bollards.