Summary
Installation of erosion prevention and sediment control measures. 2. Security fencing repairs and partial replacement (Deduct Alternate #1) to include but not limited to: A. Removal and replacement of fence posts. B. Straightening of existing posts. C. Remove and reinstall existing Intrusion Detection System D. Remove and reinstall existing razor ribbon E. Install and regrade crushed stone between fences. F. The fence repairs will be from an alternate funding source and will need to be invoiced separately from the other work. 3. Drainage improvements. 4. Construction of a new gravel wetland and forebay with overflow and outlet structure with discharge pipe. 5. Construction of a new bioretention area and swale by the maintenance building. 6. Reducing the width of the perimeter drive and paving the surface. 7. Finish grading, seeding, and mulching of disturbed areas. Maintenance of seeded areas until established.