Summary
The project generally consists of the removal of the existing detention pond outlet structure and associated drainage features, and the construction of a new reinforced concrete stormwater outlet system, including installation of storm drainage pipes. Work also includes excavation, backfill, channel modifications, and all necessary measures to ensure a watertight and fully functional drainage system. Additional scope includes surface restoration (concrete, landscaping, fencing, and site features), implementation of erosion and sediment controls, traffic control and public safety measures, dewatering as required, and all associated mobilization, construction staking, and incidental work necessary to complete the project.