CityTN
Posted
Aug 20, 2026
Sep 4, 2026
West Main Street Slope Project RFP
Project consists of but not limited to re-construct approximately 535 LF of slope. Construction will consist of sloping the existing bank to a 2:1 slope and installing a 6" high by 4'-wide berm across the top of the slope.