Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes approx. 446 LF of 8" WATER main pipe; 445 LF removal of water main;445 LF type C surface restoration (gravel roadway); 2 EA valve-8 in gate (MJxMJ).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work to be performed under this contract includes, but is not limited to, installation of approx 5,568 LF of 8" water main, which includes 935 LF of 8" dr18 c900 fusible pvc (fpvc) installed by horizontal directional drill method, six (6) fire hydrants, twenty-six (26) service reconnections, and necessary appurtenances. The project also includes eight (8) new 2-inch air release valves and replacing seven (7) 2" air release valves.
Posted Date
Jan 21, 2026
Due Date
Feb 24, 2026
Release: Jan 21, 2026
Close: Feb 24, 2026
Work to be performed under this contract includes, but is not limited to, installation of approx 5,568 LF of 8" water main, which includes 935 LF of 8" dr18 c900 fusible pvc (fpvc) installed by horizontal directional drill method, six (6) fire hydrants, twenty-six (26) service reconnections, and necessary appurtenances. The project also includes eight (8) new 2-inch air release valves and replacing seven (7) 2" air release valves.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of approximately 1500 linear feet of 6-inch DR 14 C900 PVC water line, including a regulator station, hydrants, and regrading/drainage correction, on Deception Lane in Jerome, Arizona.
Posted Date
Dec 16, 2025
Due Date
Jan 29, 2026
Release: Dec 16, 2025
Close: Jan 29, 2026
Installation of approximately 1500 linear feet of 6-inch DR 14 C900 PVC water line, including a regulator station, hydrants, and regrading/drainage correction, on Deception Lane in Jerome, Arizona.
AvailableWork consists of 12,847.44 SY pavement planing, asphalt concrete; 13. 50 CY driveway pavement replacement, type iii a (asphalt); 6.60 CY driveway pavement replacement, type iii c (gravel); 1,928.92 GAL non-tracking tack coat; 9,300 SF crack sealing, type 1; 535. 31 CY asphalt concrete surface course, type 1 (448); 4,647 SF concrete walk (4 inches); 2 EA curb ramp; 162 LF concrete curb and gutter, type standard; 2,355.22 SY temporary pavement; 820 SY seeding and mulching; 1,058 SY 6" water pipe and fittings; 81 LF 3/4" water service line transfer, short; 3 EA 1.5" water main abandoned; 20 EA fire hydrant; 3,197; LF video inspection of sewers.
Posted Date
-
Due Date
Feb 11, 2026
Release: -
Close: Feb 11, 2026
Work consists of 12,847.44 SY pavement planing, asphalt concrete; 13. 50 CY driveway pavement replacement, type iii a (asphalt); 6.60 CY driveway pavement replacement, type iii c (gravel); 1,928.92 GAL non-tracking tack coat; 9,300 SF crack sealing, type 1; 535. 31 CY asphalt concrete surface course, type 1 (448); 4,647 SF concrete walk (4 inches); 2 EA curb ramp; 162 LF concrete curb and gutter, type standard; 2,355.22 SY temporary pavement; 820 SY seeding and mulching; 1,058 SY 6" water pipe and fittings; 81 LF 3/4" water service line transfer, short; 3 EA 1.5" water main abandoned; 20 EA fire hydrant; 3,197; LF video inspection of sewers.
AvailableThe Town of Jerome seeks sealed bids for the Deception Lane Water Line Improvements, a CDBG‑funded project to install approximately 1,500 linear feet of 6‑inch PVC water line, a regulator station, and new hydrants with associated roadway restoration. A pre‑bid meeting is scheduled for January 8, 2026 at 10:00 a.m. at Jerome Town Hall, and bidding documents are available via NACOG as noted in the legal notice. Bids must be delivered to the Town of Jerome by 2:00 p.m. on January 29, 2026.
Posted Date
Dec 16, 2025
Due Date
Jan 29, 2026
Release: Dec 16, 2025
Close: Jan 29, 2026
The Town of Jerome seeks sealed bids for the Deception Lane Water Line Improvements, a CDBG‑funded project to install approximately 1,500 linear feet of 6‑inch PVC water line, a regulator station, and new hydrants with associated roadway restoration. A pre‑bid meeting is scheduled for January 8, 2026 at 10:00 a.m. at Jerome Town Hall, and bidding documents are available via NACOG as noted in the legal notice. Bids must be delivered to the Town of Jerome by 2:00 p.m. on January 29, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →