Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide engineering services for the west middletown sidewalk construction work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the preparation of construction contract plans and plan package documents, and the construction of new sidewalks along both sides of West Third Street in Tuscarawas County.
Posted Date
Jan 20, 2026
Due Date
Feb 11, 2026
Release: Jan 20, 2026
Close: Feb 11, 2026
This RFP is for the preparation of construction contract plans and plan package documents, and the construction of new sidewalks along both sides of West Third Street in Tuscarawas County.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a new pedestrian sidewalk along the south side of mechanic street. The sidewalk will extend an existing sidewalk and be constructed between 95 mechanic street and the slayton hill road intersection to improve pedestrian accessibility and safety along the project corridor. Project elements include the installation of granite curbing, bituminous concrete sidewalk, driveway apron reconstruction, stormwater infrastructure, a concrete block retaining wall, landscape restoration, and associated roadway patching.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Construction of a new pedestrian sidewalk along the south side of mechanic street. The sidewalk will extend an existing sidewalk and be constructed between 95 mechanic street and the slayton hill road intersection to improve pedestrian accessibility and safety along the project corridor. Project elements include the installation of granite curbing, bituminous concrete sidewalk, driveway apron reconstruction, stormwater infrastructure, a concrete block retaining wall, landscape restoration, and associated roadway patching.
AvailableConstruction of the mid broadwell culvert and sidewalk construction. Work includes 529 SY of concrete valley gutter 6"; 866 LF concrete sidewalk 4"; 113 LF side drain pipe 18" RCP; 250 LF remove wood fence; 55 LF storm drain pipe 96"; 50 LF concrtuct of compost sock check dam; 127 LF water main 12" (DIP, CL 350); 10 LF water service line (1-1/2"); 2 EA insertion valve 12". See attached files.
Posted Date
Jan 15, 2026
Due Date
Feb 19, 2026
Release: Jan 15, 2026
Close: Feb 19, 2026
Construction of the mid broadwell culvert and sidewalk construction. Work includes 529 SY of concrete valley gutter 6"; 866 LF concrete sidewalk 4"; 113 LF side drain pipe 18" RCP; 250 LF remove wood fence; 55 LF storm drain pipe 96"; 50 LF concrtuct of compost sock check dam; 127 LF water main 12" (DIP, CL 350); 10 LF water service line (1-1/2"); 2 EA insertion valve 12". See attached files.
AvailableDemolition and replacement of existing curb and gutter along west pike street, construction of new pedestrian sidewalks, site grading, erosion control including landscaping/sodding of all areas disturbed by construction activities, striping and pavement markings, relocation/adjustments of existing utilities, signage, and structures, and construction of retaining walls where required.
Posted Date
Dec 22, 2025
Due Date
Jan 27, 2026
Release: Dec 22, 2025
Close: Jan 27, 2026
Demolition and replacement of existing curb and gutter along west pike street, construction of new pedestrian sidewalks, site grading, erosion control including landscaping/sodding of all areas disturbed by construction activities, striping and pavement markings, relocation/adjustments of existing utilities, signage, and structures, and construction of retaining walls where required.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →