Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes open cut replacement of stormwater pipes includes approx, 226 LF of pipe and two (2) inlet catch basin, replacing the existing pipes with approx 492 LF of 24" high density polyethylene (HDPE) smooth-lined corrugated plastic pipe (SLCPP) between inlet I-10 to I-11 and I-11 to an outfall. The existing pipe, which is 36-inch by 48" corrugate metal pipe (CMP) will be replaced by two (2) side-by-side 24" HDPE SLCP.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of a new stormwater detention facility; storm sewer piping; storm manhole; endwall; outlet structure; erosion and sediment controls; security gate; restoration; and all necessary appurtenances and restoration for said construction.
Posted Date
Dec 26, 2025
Due Date
Mar 3, 2026
Release: Dec 26, 2025
Close: Mar 3, 2026
Construction of a new stormwater detention facility; storm sewer piping; storm manhole; endwall; outlet structure; erosion and sediment controls; security gate; restoration; and all necessary appurtenances and restoration for said construction.
AvailableSecurity vestibules phase 3 project.
Posted Date
Nov 24, 2025
Due Date
Feb 25, 2026
Release: Nov 24, 2025
Close: Feb 25, 2026
Security vestibules phase 3 project.
AvailableExcavation of drainage swale into stormwater pond.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
Excavation of drainage swale into stormwater pond.
AvailableProject consists of restoration of four public stormwater treatment facilities. Various restoration methods may be involved such as vegetation management, regrading, and potential subgrade replacement or surface scarifying to enhance infiltration capabilities and maintain conveyance capacity.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
Project consists of restoration of four public stormwater treatment facilities. Various restoration methods may be involved such as vegetation management, regrading, and potential subgrade replacement or surface scarifying to enhance infiltration capabilities and maintain conveyance capacity.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis