Posted
Oct 29, 2026
Nov 17, 2026
Description: The project generally consists of embankment stabilization improvements comprised of gabion baskets, gabion mattresses, loose stone riprap, and live staking. The improvements are intended to restabilize the eroded embankments, which are in close proximity to the pumping station. The tributary embankments have eroded to the extent that existing pavement and fencing have been damaged, and accordingly the project also proposes new chain link fencing, perimeter concrete flush curb, and pavement restoration beyond top of bank. It should be noted that the proposed edge of pavement will not extend beyond the existing edge of pavement, and the flush curb will maintain existing site drainage patterns. The pumping station is a critical facility for the Township, and accordingly the improvements are necessary scour countermeasures that are anticipated to repair existing damage within the site and mitigate future embankment erosion proximate to the site. As a result of Hurricane Ida, the West Lawrence site experience bank erosion along Sucker Brook, resulting in displacement and damage to the existing chain-link fence and undermining the damage to the existing asphalt pavement. The proposed improvements to the site are intended to stabilize the eroded streambank, restore the affected areas of the West Lawrence Pump Station site and address applicable permitting and regulatory requirements.
City · NJ, US
Decision makers connected to this RFP from Township of North Brunswick.
Adjacent opportunities open for bidding right now.
Posted
Oct 29, 2026
Nov 17, 2026
The project generally consists of embankment stabilization improvements comprised of gabion baskets, gabion mattresses, loose stone riprap, and live staking. The improvements are intended to restabilize the eroded embankments, which are in close proximity to the pumping station. The tributary embankments have eroded to the extent that existing pavement and fencing have been damaged, and accordingly the project also proposes new chain link fencing, perimeter concrete flush curb, and pavement restoration beyond top of bank. It should be noted that the proposed edge of pavement will not extend beyond the existing edge of pavement, and the flush curb will maintain existing site drainage patterns. The pumping station is a critical facility for the Township, and accordingly the improvements are necessary scour countermeasures that are anticipated to repair existing damage within the site and mitigate future embankment erosion proximate to the site. As a result of Hurricane Ida, the West Lawrence site experience bank erosion along Sucker Brook, resulting in displacement and damage to the existing chain-link fence and undermining the damage to the existing asphalt pavement. The proposed improvements to the site are intended to stabilize the eroded streambank, restore the affected areas of the West Lawrence Pump Station site and address applicable permitting and regulatory requirements.
CityPA
Posted
Oct 15, 2026
Nov 12, 2026
The solicitation seeks geotechnical investigation and stabilization design for approximately 1,600 feet of Pratts Dam Road beside the West Branch of Brandywine Creek, where the roadway is failing. Phase I will characterize the roadbed fill, underlying soils, and depth to rock to inform the stabilization approach. Phase II is design work; the posting identifies two soldier pile retaining walls as the most feasible solution and aims to restore the roadway and provide PennDOT-standard safety features.
CityPA
Posted
Aug 20, 2024
Nov 12, 2026
Township desires to replace the existing retaining walls along the west side of Dam Road. The work includes, but is not limited to, furnishing all necessary labor, equipment, and materials to accomplish the following: Replacement of an existing retaining wall with a soldier pile retaining wall, construction of a new, second soldier pile retaining wall, placement of rock protection along both retaining walls, drainage improvements, full depth pavement, safety feature upgrades, and other associated work.
CityKS
Posted
Oct 27, 2026
Dec 8, 2026
The work to be done under this contract includes: Installation of new chemical storage system, submersible pumps, valves, gates, piping and other miscellaneous mechanical equipment. The work includes expansion of the pump station electrical room and architectural improvements to the existing pump station structure. The work also includes replacement of major electrical equipment, instrumentation and controls upgrades, and miscellaneous building mechanical upgrades. The work also includes removal and replacement of Manhole SSMH-2350 and modifications to Manhole SSMH-2360.
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
290 days before RFP
The council-meeting resolution proposed a $150,519 CME Associates amendment for final design, permits, bid-phase services, and related direct costs for West Lawrence Street Pump Station bank stabilization.
TOWNSHIP OF NORTH BRUNSWICK RESOLUTION 077-1.26 AUTHORIZING A CHANGE IN SCOPE TO THE PROFESSIONAL SERVICE AGREEMENT WITH CME ASSOCIATES APPOINTED AS THE 2026 TOWNSHIP CONSULTING ENGINEERING FIRM TO INCLUDE DESIGN THROUGH BID PHASE PROFESSIONAL SERVICES FOR THE BANK STABILIZATION AT WEST LAWRENCE STREET PUMP STATION -- NTE $150,519.00 WHEREAS, in September…
Township of North Brunswick Township Council Meeting
Agenda packet · Jan 12, 2026
WHEREAS, in January 2026, pursuant to Resolution No. 23‐1.26, Artheon, Inc. with offices located at 1 Tower Center, 20th Floor, East Brunswick, New Jersey 08816, was authorized to provide engineering consulting services for calendar year 2026 under a fair and open contract process in accordance with N.J.S.A. 19:44A‐20.1 et seq.; and WHEREAS, pursuant to…
Township of North Brunswick Township Council Meeting
Agenda packet · Jun 8, 2026
Meeting agenda
3 days before RFP
The Township proposed advertising and receiving bids for the West Lawrence Pump Station Bank Stabilization Project, with advertisement planned for October 28, 2026 and bid opening planned for November 17, 2026.
TOWNSHIP OF NORTH BRUNSWICK RESOLUTION NO. 354 - 10.26 AUTHORIZING THE ADVERTISEMENT FOR RECEIPT OF BIDS FOR BID26003 -- WEST LAWRENCE PUMP STATION BANK STABILIZATION PROJECT WHEREAS, Hurricane Ida impacted New Jersey on September 1, 2021, bringing severe weather conditions, including strong winds and heavy and sustained rainfall; and WHEREAS, the storm…
Meeting agenda
3 days before RFP
The October 26, 2026 BID26003 resolution states that Artheon, Inc. had been authorized in 2025 to provide survey, design, permitting and bid-phase engineering services for the West Lawrence Pump Station Bank Stabilization Project.
WHEREAS, in 2025, pursuant to Resolution No. 115-3.25, Artheon, Inc. was authorized to undertake survey, design, permitting and related professional engineering services through the bid phase for the West Lawrence Pump Station Bank Stabilization Project; and
Township of North Brunswick Council Council Meeting Agenda
Meeting agenda · Oct 26, 2026
RFP published
Proposals due (12 days left)
North Brunswick Township Council Council Meeting
Meeting agenda · Oct 26, 2026
NOW, THEREFORE, BE IT RESOLVED, on this 26th day of October 2026, by the Township Council of the Township of North Brunswick, County of Middlesex, State of New Jersey, that the appropriate Township officials are hereby authorized to advertise and receive bids for BID26003 -- West Lawrence Pump Station Bank Stabilization Project, in accordance with the…
Township of North Brunswick Council Council Meeting Agenda
Meeting agenda · Oct 1, 2026
WHEREAS, in 2025, pursuant to Resolution No. 115-3.25, Artheon, Inc. was authorized to undertake survey, design, permitting and related professional engineering services through the bid phase for the West Lawrence Pump Station Bank Stabilization Project; and
North Brunswick Township Council Council Meeting
Meeting agenda · Oct 26, 2026