Summary
Work will generally consist of extending water service by constructing a new 8" water main includes traffic control; 110 CY rock excavation; 25 CY excavation beyond normal depth - unsuitable material; 10 CY controlled density fill; erosion and sedimentation control; 1,400 lf 8" HDPE water main & fittings; 90 LF of 12" HDPE water main & fittings; 3 EA 8" gate valves with boxes; 12" gate valves with boxes; 3 EA hydrant assemblies; 20 LF 1" copper tubing for water service; 1 EA 1" water service corporation; 1 EA 1" water service curb stop, box & coupling; 560 sy temporary bituminous concrete trench repairs; 390 SY permanent bituminous concrete trench repairs - town; 120 SY permanent bituminous concrete trench repairs - driveway. See attached file.